Laserfiche WebLink
6.3.4 EXHIBIT D -Reclamation Plan <br />In accordance with Rule 6.3.4(1)(c)(i), please state the thickness of plant growth medium <br />to be replaced. <br />In accordance with iRule 6.3.4(1)(c)(v), please specify, if mulch is needed, the kind to be <br />used, the crimping method, and rate of application. <br />In accordance with iRule 6.3.4(d), please specify which ponds, streams, roads, and <br />buildings will remain after reclamation. <br />In accordance with Rule 6.3.4(e), please specify the reclamation treatment of any waste <br />rock dumps, underground mine openings, ditches, sediment control facilities, buildings <br />and other features specified in the plan but not previously addressed in the Reclamation <br />Plan Narrative. ~ <br />If the information <br />under its appropri~ <br />6.3.5 EXHIBIT <br />In accordance wit: <br />Mining Plan Map <br />of the land within <br />mined, and the tyl <br />structures within <br />In acwrdance wi <br />proposed topsoil <br />In accordance wit: <br />Mining Plan Map <br />your correspondei <br />Structures." Also, <br />ditch shown on m <br />In accordance <br />overburden by <br />In accordance <br />by reclamation <br />There appears to <br />overburden. One <br />whereas another <br />guested above is provided elsewhere in the application other than <br />section, please provide the location or page number. <br />-Map <br />Zule 6.3.5(b), please label on the Pre-Mining Plan Map or on the <br />e names of owner(s) of record of the surface of the affected area and <br />)0 feet of the affected azea, identify the owner of the substance to be <br />of structure and owners of record of any permanent or man-made <br />feet of the affected area. <br />6.3.5(c), please outline and label on the Mining Plan Map the <br />ule 6.3.5(e), please note on the Pre-Mining Plan Map or on the <br />man-made structures (i.e., the ranch fences) that were described in <br />to DRMS dated Mazch 20, 2007 entitled "Exhibit L -Man Made <br />ase describe the post-mine plan and configuration of the irrigation <br />6.3.5(3)(d), please state the average thickness of replaced <br />>n azea or phase. <br />Rule 6.35(3)(e), please state the average thickness of replaced topsoil <br />or phase. <br />a discrepancy on various maps as to the placement of the stockpile of <br />ip shows the stockpile placed in the southwest comer of the site, <br />p shows the stockpile placed in the southeast corner. Please clarify. <br />