Laserfiche WebLink
<br />CIRCES Cost Estimating Software <br />MOTOR GRADER WORK <br />PROJECT IDENTIFICATION <br />Agenry or organization name : DMG <br /> <br />Task i : 02a Stale :Colorado PermiUlob tl : M-2000-0]2 <br />Dale : 0 6/1 42 0 0 1 County :Montrose Abhrenation :none <br />User : 555 Sile : B And D Trucking Filename : M072-02a <br /> <br />Permit or other job action : New r fOc Permit Application <br /> <br />Task description :Rip and grade pit floor and area around pit <br /> <br />HOURLY EQUIPMENT COST <br /> Basic machine :CAT 12H Horsepower : 740 <br /> Adachmenl no. 7 : NA Shift hasis t 7 per day <br /> Adachment no. 2 : Multi-shank dpper <br /> Utilization We Cost data source : (CRGJ <br />Cost Breakdown Ownership cosUhcur: 879.22 NA <br /> Operating cosUhcur : E24.1fi 700 <br /> Ripper op.casl/hour: 81.07 50 <br /> Operator cosVhour: 827.99 NA <br /> Total unit cost hour : 873.04 Total heel cosVhr : $]3.04 <br />MATERIAL QUANTITIES <br />Total area to be graded : 4.00 acres <br />Source of quantity lakeofl :From application maps <br /> <br />_ <br />- <br />~. __ <br />_. <br />_ , ___._ <br />, <br />~ <br />~ <br />~ <br />_ <br />_... ~ __-_ _ 1 <br />_~ <br />HOURLY PRODUCTION <br />Selected grading aclivityhvork level :Heavy grading/npping <br /> <br />Unadjusted hourly unit production : 0.46 acres/hr (Cat HB) <br />Joh Condition Correction Factors <br />Average site altitude : 5,000 feet <br />Allnude adjustment lector: O.B9 (Cat HB) <br />Job efficiency adjustment factor : O.B3 (1 shiR/day) <br />Net joh correction : 0.74 <br />Adjusted hourly unit production : 0.34 acres/hr <br />Adjusted hourly Oeel production : 0.34 acres/hr <br />J08 TIME AND COST <br />Fleet size : 1 Grader(s) Total job time : '/~, ]] Hours <br />Unit cost : 8214.93 /acre Total job cost : $860 <br />