My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE56908
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE56908
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:59:21 PM
Creation date
11/20/2007 5:14:22 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2000072
IBM Index Class Name
Permit File
Doc Date
6/20/2001
Doc Name
B & D TRUCKING FN M-2000-072 110C APPLICATION 2ND ADEQUACY REVIEW
From
DMG
To
B & D TRUCKING
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />CIRCES Cost Estimating Software <br />MOTOR GRADER WORK <br />Agency or organization name : DMG <br /> <br />Task # : O1 a Stale :Colorado PermiUjoh # : M-ZOOO-O72 <br />Dale : 0 6/142 0 0 1 County :Montrose Abbreviation :none <br />User : SSS Site : B And D Trucking Filename : M072.01a <br /> <br />Permit or other job action :New 110c Permif Applica(ion <br /> <br />task description :Reduce highwall to 3H:1 V <br /> <br />HOURLY EQUIPMENT COST <br />Basic machine :CAT 12H Horsepower : 140 <br />Attachment no. 1 : NA Shill basis : 7 per tlay <br />Attachment no. 2 : Multi-shank upper <br /> Utilization Y Cost data source : (CRGJ <br />Cost Breakdown Ownership cost/hour: Ef9.22 NA <br />Operating cosghour : E24.76 100 <br />Ripper op.cosUhour: 50.75 35 <br />Operator cosUhour: E27.99 NA <br />Total unit cosUhour: $72.72 Talal Beet cosUhr: $72.72 <br /> <br />MATERIAL QUANTITIES <br />Total area to he g2ded : O.SO acres <br />Source of quantity take-oH :6'x 1100' highwall reduced lromvertical ro 3H:1V <br /> <br />._._. _. ~__. ~-_. __. _-_.__..___-._ ______ 1 <br />HOURLY PRODUCTION <br />Selected grading aclivityM1vork level: Heary gratling/npping <br /> <br />Unadjusted hourly unit production : 0.46 acres/hr (Cal HB) <br />Job Condition Correction Factors <br />Average site altitude : 5,000 leel <br />Altitude adjustment lector : 0.69 (Car HBJ <br />Jab elBcienq adjustment lector : O.B3 (1 shiNtlay) <br />Net joh correction : 0.74 <br />Adjusted hourly unit production : 0.34 acres/hr <br />Adjusted hourly Beel production : 0.34 acreslhr <br />JOB TIME AND COST - <br />Fleet size : 1 Grader(s) Total job time : 1.47 Hours <br />Unit cost : 5213.99 /acre Total jab cost : $1O7 <br />7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.