My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO24963
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO24963
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:44:51 PM
Creation date
11/20/2007 5:10:34 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980001
IBM Index Class Name
Hydrology
Doc Date
2/24/2005
Doc Name
4th Quarter 2004 Impoundment Inspection Report Addendum
From
WWC Engineering
To
DMG
Permit Index Doc Type
Sediment Pond Inspect
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT A <br />Listed below are the known maintenance activities that will be made during the 2005 field <br />maintenance season. The results of the maintenance tasks will be reported in the 2005 Reclamation <br />Report, to be submitted on or before February 15, 2006. <br />Repair <br />Item No. <br />Location <br />Work Description <br />1 CK-3 Embankment will be re aired at bypass of spillway <br />2 CK-4 Restore spillway to general trapezoid sha e <br />3 CK-5 Restore spillway to general trapezoid shape <br />4 CK-6 Restore spillway to eneral trapezoid shape <br />5 CK-7 Restore spillway to eneral trapezoid shape <br />6 CK-8 Restore spillway to eneral trapezoid shape <br />7 CK-9 Restore spillway to general trapezoid shape, restore embankment at bypass <br />of spillway <br />8 CK-10 Embankment will be repaired at bypass of spillwa <br />9 CK-11 Restores illway to eneral trapezoid shape <br />10 CK-12 Restore spillway to general trapezoid shape <br />11 CK-13 Restore spillway to general trapezoid sha e <br />12 CK-14 Restore spillway to eneral trapezoid shape <br />13 CK-15 Restore spillway to general trapezoid shape <br />14 CK-16 Restores illway to eneral trapezoid shape <br />15 CK-17 Restore spillway to general trapezoid shape, cover fabric in spillway exit <br />channel <br />16 CK-18 Restore spillway to general trapezoid shape <br />17 CK-19 Cover fabric ins illway exit channel <br />18 CK-20 Exit channel repair <br />
The URL can be used to link to this page
Your browser does not support the video tag.