Laserfiche WebLink
ATTACHMENT A <br />Listed below are the known maintenance activities that will be made during the 2005 field <br />maintenance season. The results of the maintenance tasks will be reported in the 2005 Reclamation <br />Report, to be submitted on or before February 15, 2006. <br />Repair <br />Item No. <br />Location <br />Work Description <br />1 CK-3 Embankment will be re aired at bypass of spillway <br />2 CK-4 Restore spillway to general trapezoid sha e <br />3 CK-5 Restore spillway to general trapezoid shape <br />4 CK-6 Restore spillway to eneral trapezoid shape <br />5 CK-7 Restore spillway to eneral trapezoid shape <br />6 CK-8 Restore spillway to eneral trapezoid shape <br />7 CK-9 Restore spillway to general trapezoid shape, restore embankment at bypass <br />of spillway <br />8 CK-10 Embankment will be repaired at bypass of spillwa <br />9 CK-11 Restores illway to eneral trapezoid shape <br />10 CK-12 Restore spillway to general trapezoid shape <br />11 CK-13 Restore spillway to general trapezoid sha e <br />12 CK-14 Restore spillway to eneral trapezoid shape <br />13 CK-15 Restore spillway to general trapezoid shape <br />14 CK-16 Restores illway to eneral trapezoid shape <br />15 CK-17 Restore spillway to general trapezoid shape, cover fabric in spillway exit <br />channel <br />16 CK-18 Restore spillway to general trapezoid shape <br />17 CK-19 Cover fabric ins illway exit channel <br />18 CK-20 Exit channel repair <br />