Laserfiche WebLink
.APR ;08-1999 10:43 AGAP170 RSSOCIATES 970 245 9234 P, 09 <br />Draft: April 7. /999 rage i <br />4. All tubing, strings, and armulaz areas between well strings will be pressure tested <br />with nitrogen gas to hydrostatic pressure to ensure the mechanical integrity of the <br />tubing. <br />5. A temperature log will be performed to determine if there is any significant <br />temperature change above the nahcolite-bearing zone. <br />6. The results from these procedures wiU be evaluated to determine the best solution for <br />correcting the problem. The use of additional logging techniques may be reugired <br />to accurately pinpoint any mechanical failures. <br />7. BLM and EPA will be notified of the results of the evaluation and the prdposed <br />corrective actions to be taken. <br />Agapito Associa[es, Inc. <br />TOTRL P.09 <br />