My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE56562
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE56562
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:59:07 PM
Creation date
11/20/2007 5:07:24 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1992058
IBM Index Class Name
Permit File
Doc Date
7/27/1992
Doc Name
FAX COVER
From
BLM
To
MLRD
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
JUL c7 '92 1:11 <br />. , ~ ,.,_ <br />i <br />• <br />F'. 2%3 <br />EXHIBIT 8 <br />SPECIAL STIPULATIONS <br />1. purchaser shall prcduce annually 5000 tone of material or, in lieu of such <br />production, shall make an annual payment of an equivalent dollar amount which may <br />be credited to future production, but not refunded, unless upon expiration the <br />pur^haaer has paid for more material than originally contracted for. <br />2. Purchaser shall stake and cross-section the area required to extract all <br />materials from the Mica White Mine. This activity will be done in consultation <br />with and be reviewed by the BLM. Volume calculations utilizing this control will <br />be completed by the operator at the conclusion and prior to issuance of <br />subsequent contracts or on a yearly basic whichever comes first for material from <br />this site. All surveys and volume calculations will be submitted to the BLH for <br />review and acceptance. <br />3. The purchaser will on a monthly basis provide a record of material delivered <br />and/or removed from the site based on measurement by certified scale. Payment <br />for material will be based on this measurement subject to verification of volume <br />estimates utilizing the following formula: <br />Y = X - .10(X1 <br />2.25 S/YD <br />Y-Tannage reported <br />X-volume estimate <br />(.10) 4 waste <br />2.25 ton/yd conversion <br />If the calculated volume estimate of material removed ie in excess of the <br />reported tonnage by a factor of 5! or more then the calculated volume estimate <br />wt7.1 be utilized to determine final payment. <br />4. The processing/stockpile site is situated within the Agpoz ~9 placer claim, <br />CMC115705 which establishes prior existing rights to use of the surface within <br />said claim for mining related purposes. Therefore, should the claimants and/or <br />their designated repr 3sent at ive file under the requirements of 43 CFR 3809 £or <br />use of the processing/stockpile area, the purchaser must remove all property from <br />the site within 30 days by the BLM. <br />5. Purchaser shall defend, and hold harmleea the united Staten and/or its <br />agencies and representatives against and from any and all demands, claims, and <br />liabilities of every nature whatsoever, including, but not limited to, damage to <br />property and injuries or death of persona arising from any activity connected <br />with the purchaser's use or occupancy of the lands described in this contract, <br />or with the activity authorized under this contract. <br />6. Purchaser will conform with the procedures identified in the mining and <br />reclamation plan (exhibit C) and hereby made a part of this contract. <br />7. Purchaser will comply with all applicable Federal, State and Local permit and <br />use requirements. <br />8. A suspension of operations at the Mica White Hine for a period of 24 <br />consecutive months shall require the initiation of reclamation in accordance with <br />the requirements of the mining and reclamation plan and the Bale contract <br />following wrltten notification by the Authorized Officer. <br />
The URL can be used to link to this page
Your browser does not support the video tag.