Laserfiche WebLink
G. E.R THNORK FINISX GRADING <br />• <br />Task # <br />31 <br />Task Description <br />Cost (S) <br />I 1 <br />~J <br />Final Grade All Disturbed Areas <br />55,434 <br />Subtotal (G): 55,434 <br />H. EARTHWRK - STREAX CXANNEL CONSTRUCTION/RECONSTRUCTION <br />Task #~ Tesk Description <br />34 ~ Reconstruct/Riprap Lower Xubbard Creek <br />35 ~ Excavate for Louer Xubbard Creek Riprap Placement <br />36 ~ Reconstruct/Riprap Bear Canyon <br />37 ~ Excavate for Bear Canyon Riprap Placement <br />38 ~ Reconstruct/Riprap Elk Creek <br />39 ~ Excavate for Elk Creek Riprap Placement <br />Coet (S) <br />513,716 <br />f1, 132 <br />f7,403 <br />2768 <br />5123,607 <br />524,648 <br />Subtotal (H): 2170,674 <br />sheet 4 of 70 <br />