Laserfiche WebLink
RECLAMATION COST SUMMARY cont'd <br />• <br />E. EARTHWORK - RIPPING <br />Task Y~ Task Description <br />20 ~ Rip Cover Material for East Refuse Pile <br />21 ~ Rip All Surface facility Areas <br />~ Cost (f) <br />f11,508 <br />519,589 <br />Subtotal (E): 531,097 <br /> <br />F. EARTHWORK - ROAD RECLAMATION <br />Task N~ Task Description <br />Cost (f) <br />24 ~ Recteim Lower Hubbard Creek Access Road <br />25 ~ Reeleim Beer Creek Aetess Road <br />26 ~ Rip end Regrade C-Seam Access Road <br />27 ~ Regrade Lower Power Line Access Road <br />28 ~ Regrade Pond C Access Roed <br />5553 <br />f692 <br />5711 <br />f4,576 <br />53,536 <br />Subtotal (F): 570,068 <br />• sheet 3 of 10 <br />