Laserfiche WebLink
• CIRCES Cosl Estimating ttware <br />MOTOR GRADER WORK <br />PROJECT IDENTIFICATION <br />Agency or arganizanon name :Colo2do Division O/ Minerals And Geology <br />Task w: 031 Stata:Colorado Pennitfjob •:C-81-022 <br />Date: O6'Ot2000 County :Dena Abbrewanon :none <br />User: JAS Sile:Sanbom Creek Mme Filename:C022~03I <br />Permit or other job action :7echnical Rension 72 ~ New Elk Creek Famines <br />rack descdpnon :Final Grade All Disturbed Areas <br /> Basic machine: CAT /4G (r995) Horsepower: 200 <br /> Attachment no t : NA Shift basis : 1 per day <br /> Attachment no. 2 : NA <br /> Utilization % Cost data source : (CRG) <br /> Cost Breakdown Ownership cosVhour: $26.60 NA <br /> Operating cosVhour: $37.60 100 <br /> Ripper op.cosUhour: $0.00 NA <br /> Operator cosMour: $23.30 NA <br /> Total unit cosVhour: $89.50 Total fleet cosMr: $89.50 <br />• u..ee,., ..,~.......« <br />Total area to be graded : 90.20 acres <br />Source of quantity takeoff : Page 2.05-20 <br /> Selected grading activiry/wark level :Medium grading ony <br /> <br /> Unatljusted hourry unit produuton : <br />Job Condition Correction Faetors 1.79 acresRv (Cat HB) <br /> Average site allitutla : 6.400 lest <br /> Altitude etljustment lector : 1 CO /Ca! RB) <br /> Joh effcienry adlustmant lector : 0.83 (1 shilrPoay) <br /> Nel job correction : 0.83 <br /> Adjusted hourly unit producton : 1.49 acres/hr <br /> Adjusted howdy fleet production : 1.49 acrevhr <br />• JOa TIME AND COST <br /> Fleet size: 7 Gratler(s) ToWljob time : 60.71 Hours <br /> Unit cost: $60.2a /acre Total job cost : 55,434 <br />