Laserfiche WebLink
<br />• <br />CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />Permit or other job action : Techn~ca/ Revisrpn 31-New Elk Creek Faciblies <br />Task descdption : Reg78de Pond C Access Road <br />Agenry or organizauon name .Colorado Division O! Minerals And Geology <br />Task e: 028 Stata:Colorado PenniVobl:C-81-022 <br />Date: 06%01/2000 Counry.Della Abbreviation :none <br />User: JRS Site :Sanborn Creek Mine Filename:C022~028 <br />HOURLY EQUIPMENT COST Basic machine : Ca(OBN (1996) Horsepower : 2B5 <br />Blade ryPe :Semi-Universal <br />Attachment no. I : ROP$ Cab Shill basis : 1 per day <br />Attachment no. 2:3-shank upper <br /> <br /> Utilization Y. Cost data source: (CRG) <br />Cost Breakdown : Ownership cosdhour: 541. 10 NA <br />Operating cosdhour: 555.1id I00 <br />Ripper op. cosUhour: 56.94 100 <br />Operator cosvhour: E23. 12 NA <br />Total unit cosbhour: 5116.80 Total lleet cosbhcur: 5126.80 <br /> <br />Initial Swell Loose <br />volume: 3,333 CCY lector: I. I65 volume: 3,883 LCY <br />Soume of puantiry takeoff :Assume 5' Cut on Nonh Side. 1800Lin.F1. <br />Source of est. swell lector: CAT Handbook <br />HOURLY PRODUCTION <br />n Fecrors <br />Average push tlistance: 2PD feel Soume <br />Unadjusted hourly production : 448 LCV/hr <br />Material consistenry descriDaon <br />Camnecled 611 ar emhankmenf <br />Average Dush gradient: 0.00 %(pos) <br />Average silo altitude : 6,100 teal <br />Malarial weight : 2.900 Ibs/LCY <br />Matedal weight description <br />Decomposedrock - 50 ;Rock, 50 % Eadh <br />• JOB TIME AND COST <br />Fleet size: / Dozers) <br />Unit cost : 50.911 ILCY <br />Operator skill : 0.75 (avg <br />Material consustenry : 0.90 (Car h <br />Dozing method: I.00 (9en <br />Vlsibiflry: 1.00 (avg <br />Job eHidenry: O.B3 (IShih/~ <br />Spoil pile: 0.70 (Ind-r <br />Push gradient: 1.00 (Goth <br />AltiNda: 1.00 (Cafh <br />Materiel weight: 0.79 (Cal i <br />Blade type: 7.00 (S ar <br />Net correction : 0.31 <br />Adjusted unit production : 739.26 LCY/hr <br />Adjusted Oeet production : 139.26 LCY/hr <br />Total job time : 27.88 Hours <br />Total job cost : $3,598 <br />