Laserfiche WebLink
OIRCES Cost Estimating Software <br /> BULLDOZER WORK <br /> PRO.IECT IDENTIFICATION <br />Agency or organization name :Colorado Orvaion OI Minerals And Geology <br /> <br /> Task w : 004 State :Colorado PermiPlobar :C-81-022 <br /> Date: 06"0111000 Counry:Delta ADDrewapon:none <br /> User : JRS Site : Sanborn Creek Mina Filename : C022-OOd <br /> <br /> PBrmII or other job arnon : Tecnn~cal Remsion 32 -New Elk Creek FanLbes <br /> <br /> Task descnpuon : Baekfill Materials Used to Widen Aeeess Road <br /> <br /> HOURLY EQUIPMENT COST Basic machine :Cal OeN (1996) Horsepower : 285 <br /> Blade type : Semi-Universal <br /> Attachment no. 1 : BOPS Cab Shill basis : 1 per day <br /> Adacnment no. 2 : NA <br /> Utilization Y. Cost tlau source : (CRG) <br /> Cast Breaktlown : Ownership cost/hour: 535.17 NA <br /> Operating cosMour ~. 555.6a 100 <br /> Ripper op. cosVhour: 50.00 NA <br /> Operator cosUhour: 523.12 NA <br /> Total unit wsVhour: 5717.93 Total Ileet cosVhour : (113.93 <br />• MATERIAL OUANTRIES ~ ~ - ~~ ~ ~ -~-~ ~ ~ ~ ~ ~ ~ - J <br /> Initial Swell Loose <br /> volume: 1,600 CCY lector: 1.165 volume: 1,864 LCY <br /> Source of quantity take-oX : Techniral revision 21 <br /> <br /> Source of est. swell laclor:GAT HandbOOk <br /> HOURLY DRODUC710N <br /> Average push tlistance : 125 feet Source <br /> Operator skill: 0.75 (avg.) <br /> Matedal consistenry: 0.90 (Cat HB/ <br /> Unadjusted houry pmduttion : 686 LCY/hr Dozing methotl: 1.00 (gen.) <br /> Visibihry: 1.00 (avg./ <br /> Material wnsistenry description: Job ellidenry: 0.83 (15hA1/day) <br /> Compaged 6/l ar embankment Spoil pile: 0.80 (Ind-r0 <br /> Push gratlient: 0.83 (Cat HB1 <br /> Average push gratlienl : 8.00 % (pos) AltiNtle : 7.00 (Cal HB) <br /> Material weight: 0.70 (Cal HBl <br /> Aveage sire altitude : 6.070 leer BWde type: 1.00 (S ar U) <br /> <br /> Material weight : 3.300 Ib50.CY Net correction: 0.26 <br /> Material weight tlescriptan <br /> Oeromposed nick ~ 75?e Rack, 25% Earth Adjustetl unit protlutlion : 178.66 LCY/hr <br /> Adjusted Ileet protludion : 178.66 LCY/hr <br />• JOB TIME AND COST <br />Fleet size <br />: 1 Dozers) Total job time: <br />10.43 <br />Hours <br /> Unit cost : 50.638 rLCY Total job cost : $1,189 <br />