Laserfiche WebLink
• CIRCES Cost EstimatinD SoHware <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Agenry or oyamzation name : Colorado Division OI Minerals And Geology <br />Task M: 003 Slate :Colorado PermiVjobN: L-B7-022 <br />Data: O6'Or2000 County :Delis Abbreviation :none <br />User: JRS Site:Sanbom Creek Mine Filename :C022-003 <br />Permit or other job action :Technical Revision 32 ~ New Elk Creek Facrl~rres <br />Task description : BaeMill Substation No. 3 Pad and Sediment Pond <br /> HOURLY EQUIPMENT COST Base: machine:Car DeN (1996) Horsepower: 265 <br /> Blade type :Semi-Universal <br /> Attachment no. 1 : ROPS Cab Shitt basis : 1 per day <br /> Attachment no. 2 : NA <br /> Utili zation X Cost data source : (CRG) <br /> Cost Breakdown : Ownership cosVhour: E35.17 NA <br /> Operating cosVhour : 555.64 100 <br /> Ripper op. cosVhour: E0.00 NA <br /> Operator costfiour: 523. r2 NA <br /> Total unit cosMOUr: 5113.93 Toul fleet cosUhour: 5113.93 <br />• MATERIAL OUANTRIES <br /> Initial Swell Loose <br /> volume: 1,650 CCY lector: 1.765 volume: 1,92? LCY <br /> Source of quantity takeoM : Pege 2.05-37v and Drawing 5-097 <br /> Soume of est. Swell factor:CATHandbook <br /> <br />Average push distance : 100 leer <br />Unadjusted hoary pmtluttion : 803 LCVmr <br />Matedal consistency description <br />Compacted till or embankment <br />Aveage push gradient: 10.00 %(pos) <br />Average site altiNde: 6,200' teal <br />Material weight: 3.300 Ibs/LCV <br />Material weight description <br />• JOB TIME AND COST <br />Fleet size: / Dozers) <br />unit cost: E0.577 rLCV <br /> <br />Operator skill: <br />0.75 Source <br />(avg.) <br />Matedal consisteny: 0.90 (Cal HB <br />Dozing method : 1.00 (gen.) <br />Visibility: 1.00 (avg.) <br />Job eHidenry: 0.63 (IShM/da <br />Spoil pile: 0.60 (!rid-m <br />Push gradient: 0.79 (Car H6 <br />Altitude: 100 (Cat H6 <br />Material weight: 0.70 (Car HB <br />Blade type: f.00 (S or U; <br />Net corteaon : 0.25 <br />Adjustetl unit produttion : 197.39 LCYmr <br />Adjustetl Meet produttion : 197.39 LCY/hr <br />Total joD time : 9.73 Hours <br />Tout job cost : 51,109 <br />