In 2002, W FC backfilled and graded 30.88 acres. W FC topsoiled 18.57 acres and permanently seeded <br />10.57 acres. This reclamation work will greatly reduce the runoff of sediment from disturbed land to our <br />sediment ponds. <br />During 2001, WFC received Phase III Reclamation Bond Release for the New Horizon I permit area. <br />Ponds 001,002,004,005,and 006 were used in this area to control surface water quality. Since we <br />received final bond release, Ponds 001-006 were no longer needed and were removed and reclaimed <br />during the 2002. <br />Pond 007, 008 and the newly constructed 009 were in operation at the end of December 2002. Pond <br />007 had a continual water discharge throughout the year and all WET test results came back favorable. <br />Pond 008 did not discharge throughout the entire year of 2002. WFC had a 2001 4'" quarter W ET test <br />and some accelerated W ET test failures. The water being discharged was from a pit dewatering pump. <br />After W FC was notified of the failures, we ceased pit pumpage into Pond 008 and notified CDPHE. The <br />only explanation for the unacceptable Ceriodauphnia dubia death rate was that the retention time <br />between pit pumping and discharge was to short. The sam pit pump water was directed through Pond <br />007 and it passed all the test with good results. Pond 008 was then allowed to dry up and now it is <br />basically empty and has 100% storage capacity. <br />Pond 009, was constructed during the year and it has received zero inflow. It has been dry all year. <br />Were changes made to your SWMP for 2002? Yes <br />A new sediment pond, Pond 009, was constructed at the NHII area to assist in the SWMP plan. The <br />design for this sediment pond was submitted and approved by the DMG office. There was no discharge <br />from this pond in 2002. At the New Horizon II area, all culverts and ditches leading into Pond 007 were <br />capable of functioning as designed. There was no measurable flow thru these ditches the entire year. <br />Inflow water into Pond 007 came from pit dewatering via overland pipeline. <br />F: \data\updata\storm\02ewmprp.doc 2-3 <br />