Laserfiche WebLink
Corliss Sand Pit Calculation Notes <br />CaiGulations are based on work to 9.9 acres which is the total area of the pit. <br />$ackfilliny and pradinp <br />1,971 ft Perimeter involved x <br />118,260 sq.ft x <br />236,520 cu.ft / <br />9.9 Ac. x <br />312,984 cu.it <br />60 ft (slope distance) _ <br />2 tt (depth) _ <br />27 cu.ft = <br />43,560 sq.ft.Area in Acre = <br />Area previousry plculated + <br />Depth x <br />/ 27 cu.ft <br />Total Cubic Yards to.move <br />Dozer will move 795 CY/Hour <br />20,352 CY <br />Replace Topsoil <br />0.33 ft (inches of. topsoil) x <br />142,311 sq.ft / <br />Speedy Mover will move 117 CY/Hour <br />5,271 CY / <br />795 CY/hour <br /> <br />118,260 sq.R <br />236,520 cu.ft <br />8,760 CY <br />431,244 sq.ft. <br />118.260 s9.ft. <br />312,984 sq.R <br />ift. . <br />312,984 cu.ft <br />11,592 CY <br />8.760 CY <br />20,352 CY . <br />= 25.6 Hrs. <br />431,244 = <br />(Total Area) <br />27 cu.it. _ <br />117 CY/Hour = <br />142,311 sq.ft <br />5,271 CY <br />45.0 Hrs. <br />