My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE56384
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE56384
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:58:58 PM
Creation date
11/20/2007 5:03:22 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1994108
IBM Index Class Name
Permit File
Doc Date
2/16/1995
Doc Name
FINAL REVIEW COMMENTS BOND CALCULATION CEDAR POINT PIT FN M-94-108
From
DMG
To
NOLAND INC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Colorado Division of Minerals and Geology <br />......................................... <br />' • ESTIMATING FOAM -BULLDOZER NOR[ • <br />Task 1: 1 Prep. by: TD6 Task file Naee: N108-1 <br />Date: 02/16/95 Pereit I:M-94-108 Nine: Cedar Point Pit <br />Pereit Action: Phased 112 Pereit Application <br />Task Description: Aegrade 5 acre pit area <br />HOURLY EQUIPMENT COST <br />----===========--:=_= Basic Machine: Cat D9N NorsePOwer: 370 <br />Blade IYPe: Seei-Universal """"" <br />Attacheent I1: RDPS Cab Shift Aasis: 1/daY <br />Attacheent 12: 3-shank ripper """"" <br />Cost Breakdown: <br />""""""" Utilization i (code hke) <br />Ownership cost/hr = (52.60 N/A <br />Operating 6 overhaul cost/hr- dozer = 555.15 100 <br />-ripper = 50.00 0 <br />Operator cost/hr = 121.58 H/A <br />Total egpt. unit cost/hr = =129.32 Total fleet cost/hr: 5258.64 <br />MATERIAL gUANTITIES <br />Initial Swell Loose <br />Voluoe: !6,133.0 LCY Factor: N/A Voluee: 16,133.0 LCY <br />Source of quantity take-off: Assuee 2 ac.ft./acre over 5 acre area <br />Source of est. swell factor: HA <br />HOURLY PRODUCTION <br />Avg. push distance: 100 ft. <br />Job Condition Correction Factors <br />""""' Dperator.......... <br />Unadjusted hourly Mat. consistency.. <br />dozer production: 1099 LCY/hr Dozing eethod..... : <br />""""' Visibility........ <br />Material consistency: Job efficiency.... <br />Consolidated stockpile Transeission type. <br />..................................... Grade adjusteent.. <br />bvg. push gradient: 0.00 S (pos) Altitude adj..... <br />""""' Material weight... <br />Avg. site altitude: 6800 ft. Blade type........ <br />0.15 (avg.) <br />1.00 (Cat tbl) <br />1.00 (gen.) <br />1.00 (avg.) <br />0.83 (lsh/day) <br />1.00 ( PS ) <br />1.00 (Cat tbl) <br />1.00 (Cat tbl) <br />0.01 (Cat tbl) <br />1.OU IS or U) <br />Material weight 2650.00 lb/LCY Net Job Correction : 0.54 <br />Mat. Descr.: .•.....,. ....`•.`.,. <br />Decoeposed rock - 25S Rock, 15i Earth Adjusted Unit Prad.: 593.41 LCY/hr <br /> Adjusted Fleet Production: 1186.82 LCY/hr <br />JOB COST """""' <br />Fleet size : 2 Dozens) Total Job Tiee: 13.59 Hours <br />Unit Cost SU.218 /LCY Total Job Cost: 53,515.85 <br />
The URL can be used to link to this page
Your browser does not support the video tag.