Laserfiche WebLink
RECLAMATION COS,XNARY cont'd sh•1 of 4 <br />K. PORTAL/SHAFT SEALING <br />Task No.1 Task Description I Cost lS) <br />\aaa\\ \,\ \a\\\w\\wa\\\a\aaa\\a\w\\1\\\h\\\a\\a\aa\\a\\wa\,a aaaaa\lawa <br />\ ' • ' <br />NA ~ No such work required <br />i ~ <br />.....a.. \\aaa,aa,...a..a.aa.,a,....\...\aaa........aa..aa..a.aa..aa.a.. <br />Subtotal (K1: <br />L. DRILL HOLE/MONITORING WELL SEALING <br />Task No.. Task Description Cost (i) <br />aaa..\ a,\ ..aa\aaaa.a,a\aa\aaa\\a.\\..a,.aaaaa\.aa.,\a„a\,a ..aa.a.... <br />a <br />NA I No such work required <br />..aa.... aa..,..a.......a...\...\a..\..\....\.....aaa.a.aaa.aaa.a.aa..a. <br />Subtotal (LI: <br />M. MISCELLANEOUS RECLAMATION TASKS <br />Task No.. Task Description ~ Cost (ZI <br />•aaa M1M1aa, 4aaaM1awaaaaaaaaaa\aaaaaaaaaLaaa44a\iaaaaaaaaaaaaaa,a \aaa\4\aaM1 <br />a <br />7 I NA - This task intentionally left blank ~ <br />8 . Deoolition Per attached worksheet ~ 51,145 <br />9a d 9b ~ Seeding Per attached worksheets ~ 52,951 <br />NA ~ fencing No fencing work required ~ f0 <br /> Mob/De~ob Per attached worksheet (2,856 <br />aaaaaa aa\ aaaa4aaaaaaaa\aaa\aaa\aaaaa4aa\~ aaaaaaaaaaaaaaaaaa aaa\\aahaaa• <br /> Subtotal (M): 16,951 <br />TOTAL DIRECT RECLAMATION COSTS (subtotals A through M1: (19,126 <br />II. INDIRECT COSTS <br />A. CONTRACTOR'S OVERHEAD d PROFIT <br />Iteo No.. Ite~ Description Cost (t) <br />aaaaa\ \,4aa aaaaa\aaaaaa4aa\aaa a4aaah a\\\a wa\aaaaaaaaaa\aaa~a <br />~. a\\aa4aaa4 <br />1 <br />~ Public Liability Insurance.... 1.SSOK of dir. ~ 5306 <br />2. ~ Contractor's Perfanance Bond 0.9151 of dir. 1192 <br />3. ; Contractor's Profit........... IO.OOS of dir. ~ 11,973 <br />4. ~ Job Superintendent..Per attached worksheet ~ S1,332 <br />Subtotal (A): (3,802 <br />TOTAL CONSTRUCTION CONTRACT AMOUNT (direct plus 0 6 P1: 523,528 <br />B. DM6 PROJECT ADMINISTRATION EXPENSES <br />Itee Ho.. Ite~ Description Cost Itl <br />aaaaa\ .,\ \a\..a..a..a.a.a.aaa aa.••\.aaa\a\.aa...a...aaa.a,a \aa\aaaaaa <br />1• ~ Contract Prep., Eng. Fees..... 4.25K of cntr.l a 51,000 <br />2.. Staff Ad~in. Expenses......... O.ISS of cntr.~ =176 <br />aaaaa aaaa4aaaaaaaaaaaaaaaaa\aaa aaaaa4aaaaaaaaaa\aaaaaaaaaaaaaaa\aa\4aaaa <br />NET INDIRECT COST PERCENTAGE: 25.242 Subtotal (el: 51,176 <br />..aa.a.... ---•------- <br />TOTAL INDIRECT RECLAMATION COSTS (subtotals A through B): 54,979 <br />TOTAL PERFORMANCE BOND AMOUNT (direct plus indirect casts): 524,104 <br />