Laserfiche WebLink
~,~--_-----~--~r_ -- . _ . - -- <br />` ;T rado Division of Minerals and 6eologY <br />- ~ ..................................... sh ! of 4 <br />RECLAMATION COST SUMMARY FORM <br />----------------------------- <br />----------------------------- <br />PERMIT NUMBER : N-94-108 PREP. BY: TD6 FILENAME: N108-0 <br />........ ........ ............ <br />DATE : 16-Feb-95 OPERATION: Cedar Paint Pit <br />PERMIT ACTION : Phased 112 Penit Application <br />6AAND TOTAL BOND AMOUNT : 524,104 <br />I. DIRECT COSTS ===-=___=__= <br />------------------------------------------------------------------------ <br />------------------------------------------------------------------------ <br />A. EAATHNORK - BACKFILLIN6 6 ROUBH 6RADIN6 <br />Task No.; Task Description ~ Cost IS) <br />1 ;Regrade 5 acre pit area . , (3,516 <br />2 1 Regrade 5 acre facilities area ~ f2,683 <br />, <br />, <br />, <br />, <br />, <br />, <br />, <br />, <br />Subtotal (AI: 56,199 <br />B. EARTHWORK - HI6HWALL REDUCTION <br />Task No.. Task Description Cost (f) <br />NA .Work included in task 1 1 <br />, <br />..n,..a....a ...............a,,............a,h................a.......5 a. <br />Subtotal lBl: <br />C. EAATHNORC -HASTE PILE COYER PLACEMENT <br />Task Na.~ Task Description Cost (S) <br />•...,. .~. ..4 .............................................~• ......,... <br />• 1 • 1 <br />NA ~ No such xork required <br />, <br />, <br />, <br />®~~~~~ <br />~~~~~ <br />Subtotal (C): <br />