Laserfiche WebLink
RESPONSE <br />~ To minimize erosion straw bales will be placed every 200 ft. <br />These bales will act as sediment traps and reduce the velocity <br />of the water. <br />Discharge from pond H-G 8 during spring runoff is expected to <br />cause some erosion of the newly reclaimed area. As soon as the <br />water discharge from pond H-G 8 stops, any deep rills or gullies <br />which may be present will be filled and reseeded. These <br />measures will be continued as long as necessary to stabilize the <br />area. <br /> <br />r1 <br />U <br />