<br />REDUCTION OF PIT SLOPES <br />Costs for reduction of pit slopes were developed based <br />on using D-9H dozers equipped with U-blades. Pit <br />slopes were reduced in those areas not backfilled with <br />material from the unreclaimed dump area. Slopes were <br />reduced to 3h:ly slopes and contoured to allow complete <br />drainage into Hayden Gulch. Volumes of dozed material <br />and average push distances were developed from cross <br />sections. Cost Detail for Reducing Pit Slopes is <br />summarized in the following work sheets. <br />Cost Breakdown: <br />Operation Equipment Equipment Cost Operator Cost Total Cost <br />Reduce Slopes D-9H $25,770 $4,920 $30,690 <br />TOPSOIL DISTRIBUTION <br />Cost for Topsoil Distribution were developed based on using <br />TS-24 scrapers. Six haul cycles were developed and pro- <br />duction rates determined using the Terex "Production and <br />Cost Estimating of Material Movement with Earthmoving <br />• Equipment." Cost Detail for topsoil distribution are <br />summarized in the following calculation sheets. <br />Cost Breakdown: <br />Operation Equipment Equipment Cost Operator Cost <br />Topsoil Scrapers $240,360 $92,855 <br />TOTAL $283,215 <br />REVEGETATION <br />Revegetation of Disturbed Lands includes the dump area, pit <br />area, facilities area, and the cleared and grubbed area <br />adjacent to the mine. The total area disturbed at the <br />time of this reclamation study (end 1981) is 186.9 acre. <br />Costs were developed based on fixed bid in October, 1980 <br />for hydromulching and hydroseeding, and with guaranteed <br />application. A total cost of $600 per acre was used for <br />revegetation. Total costs is $112,140. <br />ADMINISTRATIVE COSTS <br />Administrative Costs are defined as those casts for General <br />. Expenses and Overhead and includes costs for contracting, <br />