Laserfiche WebLink
<br />ADMINISTRATIVE COSTS continued <br />management, engineering, office supplies, and administrative <br />costs. Costs were developed based on 150 of total operating <br />costs. Total operating costs includes operating labor and <br />equipment operating cost. The operating costs are itemized <br />below. <br />Total Operating Cost - $727,371 <br />Total Administrative-Cost at 15~ _ $109,181 <br />• <br />SUMMARY OF RECLAMATION COSTS - MINE AREA <br />Operation <br />Facilities Removal <br />Backfill Pit <br />Reduce Pit Slopes <br />Topsoil Distribution <br />Revegetation <br />Administrative <br />Total Costs <br />$ 7,366 <br />817,094 <br />30,690 <br />283,215 <br />112,140 <br />109,007 <br />$1,359,512 <br />Cost per acre - $1,359,512 186.9 = $7,274 <br />• <br />