Laserfiche WebLink
_. Revision to Section 2.05.4(b) <br />Loadout Cost Summa <br />Facilities Removal <br />Rail and Tie Removal <br />Load, Haul and Dispose of RR Ballast <br />Remove Fill <br />Replace Topsoil (RR) <br />Revegetation (RR) <br />Strip Facilities Pad <br />Replace Topsoil Facilities Pad <br />Revegetation (Pad) <br />Subtotal <br />10% Administrative Cost <br />Total Loadout Cost <br />• Total Mine Cost <br />GRAND TOTAL <br /> <br />$ 105,633 <br />167,370 <br />26,387 <br />132,289 <br />22,412 <br />35,340 <br />4,882 <br />4,882 <br />14,880 <br />$ 514,075 <br />51,408 <br />$ 565,483 <br />$1,541,753 <br />$2,107,236 <br />751/70/30 Revised January 1985 <br />