Laserfiche WebLink
U <br /> <br /> <br />Revision to Section 2.05.4(b) <br />Replace Topsoil - Facilities Area - 10,000 yd3 <br />.33 mi. loaded = .8 min <br />.33 mi. empty = .8 min <br />load = .6 min <br />dump = .7 min <br />2.9 min <br />20.7 trips/60 min. hour x 27 yd3/load x 83% Efficiency <br />yd3/hour <br />10,000 yd3 ~ 465 yd3/hr = 22 hours <br />Scraper, 22 hours @ $221.90 = $4,882 <br />Revegetation at Facilities Area <br />16 acres x X930/acre <br />751/70/29 <br />_ $14,880 <br />= 465 <br />Revised January 1985 <br />