EXH1B1'1 19 <br />BONDING SCHEDULE lor'I'R-55 <br />ACTIVITY QUANTITY UNIT' COST 'fO'fAL BOND <br />Site Preparation <br />Topsoil Salvage (D-8) 2 Hrs $ 110/hr. $ 220 <br />Grading Pad & Access (D-8) 4 Hrs $ ] ] 0/hr 440 <br />Safety Panels <br />4' x10' Prefab Panels 10 Ea $ 50/I~a 500 <br />Placement, Man-Hrs 2 I-Irs $ 25/Hr 50 <br />Remove Concrete Cap (10 Ton Crane) <br />Mobilization (Weston) 1 Ea $500/Ea 500 <br />Hourly 4I-Irs $I50/I-Ir 600 <br />Shaft Abandonment <br />Rock & Pit Run Material (Initial) <br />Transport & Stockpile 220 Yds3 $ I 0/yd 2,200 <br />Push into Shaft (D-8) 4 Hrs $110/hr. 440 <br />Bentonite (Including Placement) 700 Sacks $ 9.60/Sack 6,930 <br />MIDCON 2 Standard Cement 4700 Sacks $ 14.37 67,539 <br />Super CBL Additive 470 Lbs. $ 4.80 2,256 <br />Pit Rwi Material (Final) , <br />Transport & Stockpile 400 Yds3 $ 10/yd 4,000 <br />Push into Shaft (D-8) 8 I-Irs $1 10/Hr 880 <br />Wireline Rig <br />Mobilization (Trinidad) 4 Ea $125/Ca 375 <br />Hourly 8 Hrs. $ 55/Hr 440 <br />Cement Plug 16 yd3 $ 75/yd I ,200 <br />Site Reclamation <br />Establish Contour (D-8) 4 Hrs $1 10/hr 440 <br />Spread Topsoil (D-8) 2 Hrs $1 10/hr. 220 <br />Seeding (2 Acres) <br />Seed Mix SO lbs $12.50/Ib 625 <br />Mulch 4 tou $120/ton 480 <br />Application 2acres $500/ac. 1,000 <br />TOTAL DIRECT COST $91,335 <br />TR-54 Exhibit 19-9 (Revised 2/27/04) <br />