Laserfiche WebLink
1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />once in the spring end once in the fall. These inspection reports will be kept at the <br />loadout office. Problems will be noted on the reports and the inspector will be <br />responsible for implementing necessary corrective actions to repair the problem areas. <br />Allowable Non-Stormwater Discharges <br />Irrigation ditches are shown on Exhibit "SNNP-3", Facilities (please refer to Legend). <br />These ditches only run under the rail spur and not within the crusher/loading facilities <br />area. <br />Post Ooeration Procedures <br />Reclamation of the facility will disturb additional areas due to grading of the facility <br />area end railroad track. Prior to reclamation of this facility NGTI will amend this plan <br />to include additional erosion control measures to be implemented while revegetetion is <br />being accomplished. <br />Certification <br />I certify that 1 have personally examined and am familiar with the information submitted <br />in this plan and all attachments and that, based on my inquiry of those individuals <br />immediately responsible for obtaining the information, 1 believe that the information is <br />true, accurate, and complete, to the best of my knowledge. <br />% ~ <br />A. SIGNATURE OF YNER/REPRESENTATIVE <br />Michael H. Hyer <br />C. NAME (PRINTED) <br />5 <br />',st S ~-/ <br />B. DATE SIGNED <br />Vice President <br />D. TITLE <br />