Laserfiche WebLink
CIRCES Cost Estimating Software <br />• <br />PROJECT IDENTIFICATION <br />Task # : 041 State :Colorado <br />Date : 12/15/2004 <br />User : JRS <br />County :Las Animas Abbreviation :none <br />Site :Lorencito Canyon Mine Filename :C084-041 <br />Agency or organization name : Colorado Division Of Minerals And Geology <br />Permit or otherjob action : Current Permitted Estimate <br />Task description : Replace Topsoil from Upslope Area to W-4 <br />HOURLY EQUIPMENT COST <br /> Basic machine : Cal D9R - 9SU Horsepower : 405 <br /> Blade type : Semi-Universal _ <br /> Attachment no. 1 : ROPS Cab ShiFt basis : 1 perday <br /> Attachment no. 2 :3-shank ripper <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $51.01 NA <br /> Operating cosUhour : $93.54 100 <br /> Ripper op. cost/hour : $0.00 0 <br /> Operator cosUhour : $31.76 NA <br /> Total unit cosUhour : $176.31 Total fleet cosUhour : $352.63 <br /> • <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 1,090 BCY factor : 1.250 volume : 1,362 LCY <br /> <br />Source of estimated volume :Table 2.05.4- 1f <br />Source of estimated swell factor :CAT Handbook <br />., r. :,,. <br />HOURLY PRODUCTION ;; <br />Job Condition Correction Factors , <br />Source <br /> Operator skill : 0.75 (avg.) _ <br />Average push distance : 125 feet Material consistency : 0.90 (Cat HB) <br />Unadjusted hourly production : 1,055.6 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) _ <br />Material consistency description : Job efficiency : 0.83 (lshift/day) <br />Compacted fill orembankment Spoil pile : 0.60 (fnd-sf) <br /> Push gradient : 1.11 (Cat HB) <br />Average push gradient : 5.00 % (neg) Altitude : 1.00 (Cat HB) <br />Average site altitude : 7,100 feet Material weight : 0.90 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,550 Ibs/LCY Net correction : 0.34 <br />Weight description <br />Earth -Dry packed <br />JOB TIME AND COST <br />PermiUjob# : C-96-084 <br />Adjusted unit production : 356.86 LCYmr <br />Adjusted fleet production : 713.72 LCYlhr <br />• <br />