Laserfiche WebLink
CIRCES Cost Estimating Software <br />J <br />~~ <br />PROJECT IDENTIFICATION <br />Task # : 040 <br />Date : 12/15/2004 <br />User: JRS <br />State :Colorado PermiUjob# : C-96-084 <br />County :Las Animas Abbreviation :none <br />Site :Lorencito Canyon Mine Filename : C084-040 <br />Agency or organization name :Colorado Division Of Minerals And Geology <br />Permit or other job action :Current Permitted Estimate <br />Task description :Replace Live-Handled Topsoil to W-4 <br />HOURLY EQUIPMENT COST <br />Cost Breakdown <br />MATERIAL QUANTITIES <br />Initial <br />volume : 1,090 <br />Basic machine : Cat ~D9R - 9SU <br />Blade type :Semi-Universal <br />Attachment no. 1 ;ROPS Cab <br />Attachment no. 2 :3-shank ripper <br />Ownership cosf/hour <br />Operating cosUhour <br />Ripper op.cosUhour <br />Operator cosUhour <br />Total unit cosUhour <br />Utilization <br />$51.01 NA <br />$93.54 100 <br />$0.00 0 <br />$31.76 NA <br />Shift basis : 1 perday <br />Data source : (CRG) <br /> <br /> <br /> <br /> <br />$176.31 Total Fleet cosUhour <br />$352.63 <br />Swell Loose <br />CCY factor: 1.125 volume: 1,228 LCY <br />Source of estimated volume :Table 2.05.4-1f <br />Source of estimated swell factor :CAT Handbook <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 125 feet Material consistency : 0.90 (Cat HB) <br />Unadjusted hourly production : 1,055.6 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1 shi#/day) <br />Compacted till or embankment Spoil pile : 0.60 (fnd-sf) <br /> Push gradient : 1.00 (Cat HB) <br />Average push gradient : 0.00 % (pos) Altitude : 1.00 (Cat HB) <br />Average site altitude : 7,100 feet Material weight : 0.90 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2, 550 IbslLCY Nel correction : 0.30 <br />Weight description <br />Earfh_ -Dry packed Adjusted unit production : 319.94 LCY/hr <br /> Adjusted fleet production : 639.87 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 2 Dozers) <br />Unit cost : $0.551 /LCY <br />Total job time <br />Total job cost <br />Horsepower: 405 <br />1.92 Hours <br />$676 <br />Z3-~! <br />