My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE55912
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE55912
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:58:36 PM
Creation date
11/20/2007 4:49:09 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996084A
IBM Index Class Name
Permit File
Doc Date
1/11/2005
Section_Exhibit Name
Exhibit 23 Bond Calculations
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
sheet 1 0(2 <br /> CIRCES Cost Estimatino Software <br /> TRUCK/LOADER TEAM WORK <br />• <br />PROJECT IDENTIFICATION <br />Agency or organization name :Colorado Division O1 Minerals And Geology _` <br />Task # : 037 State :Colorado Permiujob # : C-96-084 <br />Date : 12/15/2004 County :Las Animas Abbreviation :none <br />User: JRS Site:Lorencito Canyon Mine Filename:C084-037 <br />Permit or other job action : Cunent Permitted Estimate <br />Task description :Replace Topsoil from Haul Road Stockpiles to Service Area <br />s: ; <br />_ ., <br />HOURLY EQUIPMENT COST Shift basis : 1 per day <br />Truck/loader team -Truck :Cat 773D <br />-Loader :CAT 990 Series ll <br />Support equipment -Load area :Cat D9R - 9SU <br />-Dump area :Cat D9R - 9SU <br />iad maintenance -Motor grader :CAT 14H <br />-Water truck :Water Tanker. 5.000 Gal. <br />• <br />Cost Breakdown : ruck/Loader Work Team <br />Truck Loading Tool Support Equipment <br />Load Area Dump Area Road Maintenance Equipment <br />Motor Grader Water Truck <br />Import data filename : tmck2 loader dozer dozer grader misctruk <br />Utilization-machine : 96 100 50 100 25 25 <br />-Ripper attachment: NA NA 50 0 NA NA <br />Ownership cost/hour: $58.05 $77.61 $51.07 $51.01 $34.94 $22.35 <br />Operating cosUhour: $72.17 $94.87 $46.77 $93.54 $10.60 $9.>8 <br />Ripper op. cosf/hour : NA NA $4.51 $0.00 $0.00 NA <br />Operator cost/hour: $21.80 $31.95 $31.76 $31.76 $31.95 $21.16 <br />Unit subtotals : $752.02 $204.42 $134.05 $176.31 $77.49 $52.69 <br />Number of units : 4 1 1 1 1 1 <br />Group subtotals : Work : $812.52 Support : $310.36 Maintenance ~. $130. i8 <br />Total work team cost/hour : $1 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 210 CCY factor : 1.125 volume : 236 LCY <br />Descr.: Earth -dry packed Heaped volume <br />Rated payload : 1CE,060 pounds Average volume <br />Payload capacity : 42.38 LCY Adjusted volume': <br /> Final truck volume based on number of loader passes <br /> -truck volume adjuslad to not excaW ralad payload or heaped volume <br />Loadinn Tool Capacity : IJOb Condition Corrections <br />Rated capacity (nom. heaped) : 11.250 LCY Truck <br />Descr.: Loose matedal - 1"and over (85 - 9n%) Altitude adj.: 1.000 <br />• Bucket 611 factor : 0.875 Job efficiency : 0.830 <br />Adjusted bucket capacity : 9.843 LCY Net correction : 0.630 <br />34.80 LCY <br />46.40 LCY <br />40.60 LCY <br />42.38 lCY <br />39.38 LCY <br />Site altitude (ft.) : 7,100 <br />Loader Source <br />1.000 (Cat H8 <br />0.830 (1 shiR/da <br />0.830 <br />Z3 -y7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.