Laserfiche WebLink
CiRCES Cost Estimating Software <br />• <br />PROJECT IDENTIFICATION <br />Task # : 036 <br />Dale : 1 2/1 52 0 0 4 <br />User : JRS <br />State :Colorado <br />County :Las Animas <br />Site : Lorencito Canyon Mine <br />Agency or organization name :Colorado Division Of Minerals And <br />Permit or other job action :Current Permitted Estimate <br />Task description :Replace Topsoil from SA S <br />HOURLY EQUIPMENT COST <br />PermiUjob# : C-96-084 <br />Abbreviation :none <br />Filename :C084-036 <br />to Service Area <br />Basic machine :Cat D9R - 9SU <br />Blade type :Semi-Universal <br />Attachment no. 1 :ROPS Cab <br />Attachment no. 2 :3-shank ripper <br />Cost Breakdown <br />Ownership cosUhour <br />Operating cost/hour <br />Ripper op.cosUhour <br />Operator costJhour <br />Total unit cost/hour <br />Horsepower: 405 <br />Shift basis : 1 perday <br /> Data source : (CRG) <br /> Utilization <br />$51.01 NA <br />$93.54 100 <br />$0.00 0 <br />$31.76 _ NA <br />$176.31 Total 9eet cost/hour : $352.63 <br />MATERIAL QUAN7ITIES • <br />Initial Swell t_oose <br />volume : 210 CCY factor : 1.125 volume : 236 LCY <br />Source of estimated volume :Table 2.05,4-1f <br />Source of estimated swell factor :CAT Handbook <br />HOURLY PRODUCTION Job Condition Correction Factors ~ Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 75 feet Material consistency : 1.00 (Cat HB) <br /> <br />Unadjusted hourly production : <br />1,514.3 <br />LCY/hr <br />Dozing method : <br />1.00 _ <br />(gen.) <br /> Visibility : 1.00 (avg.) <br /> <br />Material consistency description : <br />Job efficiency : <br />0.83 _ <br />(lshifbday) <br />Consolidated stockpile Spoil pile : 0.60 ((nd-st) <br /> <br /> Push gradient : 1,00 (Cat HB) <br />Average push gradient : 0.00 % (pos) Altitude : 1.00 (Cat HB) <br />Average site altitude : 7, 700 feet Material weight : 0, 90 (Caf Ii8) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,550 IbalLCY Net corredion : 0.34 <br />Weight description _ <br />Earth -Dry packed Adjusted unit production : 509.96 LCY/hr <br /> Adjusted flee) production : 1,019.91 LCYBir <br />