Laserfiche WebLink
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : 012 <br />Date : 1 2/1 42 0 0 4 <br />User : JRS <br />State :Colorado PermiUjob # : C-96-084 <br />County :Las Animas Abbreviation :none <br />Site :Lorencito Canyon Mine Filename : C084-012 <br />Agency or organization name :Colorado Division OI Minerals And Geology <br />Permit or other job action :Current Permitted Estimate <br />Task description :Grade Jeff Canyon Mine <br />HOURLY EQUIPMENT COST <br />Basic machine :CAT 14H <br />Attachment no. 1 :NA <br />Attachment no. 2 : NA <br />Horsepower: 215 <br />Shift basis : 1 perday <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown Ownership cosUhour : $34.94 NA <br />Grader operating cosUhour : $42.39 100 <br />Ripper operating cosUhour : $0.00 NA <br />OperatorcosUhour : $31.95 NA <br />Total unit cost/hour : $109.28 Total fleet cosUhour : $109.28 <br />.. .. .... .. <br />MATERIAL QUANTITIES ~~ .. is <br />Total area to be graded or ripped : 40.00 acres <br />Source of estimated acreage :OperatorEStimate <br />HOURLY PRODUCTION <br />Selected application :Finish grading (0-2.5 mph) <br />Average grader speed : 1.25 mph <br />Selected blade angle : 30 degrees' <br />Effective blade length : 12.10 feet <br />Width of blade overlap per pass : 2.00 feet <br />Net grading or ripping width per pass : 10.10 feet" <br />Unadjusted hourly unit production : 1.5303 acres/hour <br />Job Condition Correction Factors <br />Average site altitude : 7,000 <br />Adjusted hourly unit production <br />Adjusted hourly Fleet production <br />JOB TIME AND COST <br />Fleet size <br />' at 0 degrees, blade Is perpentlicular <br />to direction or travel. <br />"width of ripper beam on ripping applications <br /> Source <br />feet Altitude adjustment factor : 1.00 (Cat HB) <br />Job efficiency adjustment factor : 0.85 (lsh/d, mod.) <br />Net job correction : 0.8500 multiplier <br />1.3008 acres/hour <br />1.3008 acres/hour <br />grader(s) <br />Unit cost : $84.01 per acre <br />Total job lima <br />Total job cost <br />30.75 hours <br /> <br />