PERMFILE55912
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE55912
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:58:36 PM
Creation date
11/20/2007 4:49:09 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996084A
IBM Index Class Name
Permit File
Doc Date
1/11/2005
Section_Exhibit Name
Exhibit 23 Bond Calculations
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimation Software <br />• BULLDOZER RIPPING WORK <br />Task # : 008 <br />Date : 12/14/2004 <br />User: JRS <br />State :Colorado <br />County :Las Animas <br />Site :Lorencito Canyon Mine <br />Perrnit/job # : C-96-084 <br />Abbreviation :none <br />Filename : C084-008 <br />Agency or organization name :Colorado Division O/ Minerals And Geology <br />Permit or otherjob action :Current Permitted Estimate <br />Task description :Rip Jeff Canyon Topsoil Stockpile Base <br />HOURLY EQUIPMENT COST <br /> Basic machine : Cat D10R - IOSU Horsepower : 570 <br /> Blade type : Semi-Universal <br /> Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br /> Attachment no. 2 : 1-shank ripper <br /> Data source : (CRGJ <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $69.75 NA <br /> Dozer operating cost/hour : $124.53 100 <br /> Ripper operating cosUhour : $13.24 100 <br /> OperatorcosUhour: $31.76 NA <br /> Total unit cosUhour : $239.28 Total fleet cosUhour : $478.57 <br />• <br />MATERIAL QUANTITIES <br /> Selected estimating method : Seismic <br />Altemate methods - <br />Seismic : 8,900 CCY Load factor : 0.875 Bank volume : 7,788 BCY <br />Area : NA acres Rip depth (ft) : NA Volume : NA BCY or CCY <br /> <br />Source of estimated quantity :Operator Estimate <br />Source of estimated load factor :CAT Handbook <br />,s .:... ..., ....~... ... ... . <br />HOURLY PRODUCTION ;. ,::: ;: z: <br />Alternate methods - Job Condition Correction Factors - <br />Seismic: Seismic velocity : 5,000 feet second Unadjusted production <br />Unadjusted production : 673.60 cu. yds./hour per selected method : 673.60 cu. yds./hour <br /> <br />Area : Avg. ripping depth : NA feeUpass Site altitude : 7,000 feet <br />Average ripping width : NA feeUpass Altitude adjustment : 1.00 (Cat HB) <br />Average ripping length : NA feetpass Job efficiency factor : 0.83 (1 shiWday) <br />Average dozer speed : NA feeUminute Net job correction : 0.83 multiplier <br />Average maneuver time : NA minutes/pass <br />Production per unit area : NA acres/hour Adjusted unit production : 559.09 cu. yds./hour <br />Unadjusted production : NA cu. yds.mour Adjusted Fleet production : 1,118.18 cu. yds./hour <br />JOB TIME AND COST <br />Fleet size : 2 dozers) Total job time : 6.96 hours <br />Unit cost : $0.428 per cu. yd. Total job cost : $3,333 <br />Z3 -17 <br />