<br />1 <br />1 Road access to the site will be to C~ Road at a point <br />' approximately one quarter mile east of 32 Road. This <br />is the present property access. <br />' Less than 70,000 cubic yards of material will be removed <br />per year. It is expected that the pit life will be <br />about 10 years. <br />This development schedule will allow that approximately <br />five acres will be initially disturbed. Overburden will <br />be stock-piled on about a one acre area. Approximately <br />' one acre per year will be excavated. <br />t Truck traffic will v <br />maximum traffic will <br />' short duration haul. <br />10 trips per day and <br />' place. <br />ary upon construction need. The <br />be 120 truck trips per day on a <br />Average will be on the order of <br />much of the year no haul will take <br />Hours of operation will normally be within the 6:OOa.m. <br />to 7:OOp.m. limits of the Mesa County Standards. <br />Emergency situations may require longer daily operation <br />' or weekend operation. <br />' Reclamation will consist of replacing 6 inches overburden <br />over the slopes and 29 inches on the floor of the pit. <br />t A drainage ditch will be placed at the slope toe to <br />intercept seepage. The one foot of gravel left on the <br />pit floor and covered with overburden will permit the <br />site to be used as agricultural ground. Slopes will be <br />seeded with native grasses as recommended by the Soil <br />' Conservation Service. <br />t <br />