My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO24524
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO24524
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:44:34 PM
Creation date
11/20/2007 4:45:08 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981025
IBM Index Class Name
Hydrology
Doc Date
4/6/1998
Doc Name
1st QTR 1998 DMRs
From
MINREC INC
To
DMG
Permit Index Doc Type
DMR’s
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MINREC, INC. <br />27(,S COMPASS DRIVE, SUITE 101 <br />GRAND JUNCTION, COLORADO A1501 <br />PHONE: (9711) 2J5-1t01, FAX 212-79118 <br />NORTH THOMPSON CREEK MINES <br />March 23, 1998 <br />Carla Lenkey <br />Colorado Department of Health <br />Water Quality Control Division <br />WQCD-PE-82 <br />4300 Cherry Creek Drive South <br />Denver, Colorado 80222-1530 <br />Attention: Permits and Enforcement <br />Re: CDPS Permit No. CO-0029599 <br />First Quarter WET Test <br />Pitkin County <br />Dear Ms. Lenkey: <br />During the week of March 16'" through March 20'" water samples were collected for the first <br />quarter chronic two species WET test. Water sample collection involved utilizing a snowmobile <br />to access the reclaimed mine site <br />On Monday March 23n0 , I was notified by Commercial Testing 8 Engineering they had a double <br />control failure on the Fathead Minnow species. Therefore, the test for this species would be <br />considered invalid. After discussing this issue with you, and recognizing it is to late to retest for <br />the Fathead Minnow species, we agreed to the following: <br />1. Report on the DMRs the test was invalid. <br />2. Have CT 8 E report the test was invalid and the double control failure did not indicate the <br />effluent was toxic. <br />3. Commit to performing the routine second quarter test no later than May 15'" in order to <br />assure the effluent is not toxic. <br />I will attach this letter to the DMRs to assure there is no confusion regarding this matter. Please <br />call if you have any questions. <br />Sincerely, <br />J. E. Stover, P.E. <br />Consulting Engineer <br />CDOH3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.