My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE55748
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE55748
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:58:30 PM
Creation date
11/20/2007 4:44:06 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1997027
IBM Index Class Name
Permit File
Section_Exhibit Name
EXHIBIT D RECLAMATION PLAN
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Exhibit D -Reclamation Plan continued <br />• .Seeding; Seedbed preparation for 9.7 ac. Use 230 DBH 4wd farm tractor with disk <br />attachment. Approx 3 ac./hr production rate. Total of approx 3.2 hr say 4 hr. Required at <br />90 $/lu (includes equipment and operator) ........................................................ $360 <br />Seed for 9.7 ac. Current price of seed mixture given in Exhibit D Item c. [s approx 150 <br />$/ac. (Sharp Bros. Seed Co.) ............................................................................. $1,455 <br />Seeding of 9.7 ac. Using 80 DBH 4wd farm tractor with drill attachment. Approx. 4 ac/hr <br />drilling rate. Total of 2.4 hr say 3 hr at 70$/hr. (Includes equipment and <br />operator) ........................................................................................................... $210 <br />• Mulching; Mulch, application and crimping for 9.7 ac use 2 tons/ac. hay. Total of 19.4 <br />tons at 100$/ton ($1,940). Use 230 DBH farm tractor with power mulcher and two <br />operators. Approx. 3 ac/hr application rate. Total of approx. 3.2 hr say 4 hr. required at <br />95 $/hr ($380). Crimp mulch using same tractor with crimper and one operator. Approx <br />3 ac/hr. Total of approx 3.2 hr say 4 hr. required at 85 $/hr ($340) .................... $2,700 <br />• Fertilizntion; Two soils tests obtained from Colorado State University soils lab. Cost of <br />standard test and shipping ($45). Fertilizer for 9.7 ac. Per soils test but for purposes of <br />bond assume that 87 Ibs/ac. 46-0-0 (at $0.19/16.), 89 Ibs/ac. 0-45-0 (at $0.18/16.), and 65 <br />Ibs/ac. 0-0-62 (at $0.16/16.), current price is 42.95$/ac ...................................... $462 <br />• ~Yfnbilize/demohili;.e and site cleanup; Mobeldemobe assume I hr each way for <br />equipment at given rental rates ($710). Site clean up. Assume 4 hrs labor at 10 $/hr and <br />one truck load to public landfill at $70. Truck rental at $150 ............................. $Q~ <br />Total $13,797 <br />
The URL can be used to link to this page
Your browser does not support the video tag.