<br />Exhibit D -Reclamation Plan continued <br />VI Shrubs and Trees; No shrubs or trees are to be planted. <br />D. Items to Remain Post Reclamation; The pre-existing access road will remain per the <br />wishes of the land owner. No other items are to remain post reclamation. <br />E. Reclamation of Mine Features; Upon reclamation the mine site will be a flat to gently <br />sloping pit floor that will daylight at the mesas west edge. The east side will accommodate a <br />3H:1 V slope back up to the original undisturbed pre-mining elevation. There are no other features <br />descriptive of the pit site. <br />F. Reclamation Cost Estimate; The worst case condition (ie. Maximum disturbance with <br />no reclamation) is assumed for calculating the estimated financial warranty for this site. The total <br />permit area is 9.7 +/- acres. Of this, approximately 9.7 acres will be disturbed and require <br />reclamation. The reclamation tasks to be performed are described throughout this Exhibit D. <br />13nckfriting; No backfilling should be necessary as the pit will daylight to the edge of the <br />mesa and under worst case conditions only regrading should be required. <br />Crnrting; Final grade pit cut slopes to 3H: I V. Assume a average slope lensnh of 40ft by <br />1000 Ift. Total of 8,898 cy to be moved (avg 8.89 cy/Ift) using D-9 dozer (avg push <br />distance about 45 ft). Est. Performance using straight blade of 700 cy/hr. (Cat. <br />performance handbook; includes correction factors). Approx.12.7 hr. say 13 hr. at <br />140$/hr ............................................................................................................. $1,820 <br />Miscellaneous minor smooth grading on remainder of floor and perimeter of affected area <br />includes runoff control ditching and berms as may be necessary. Est. 8 hr. required using <br />D-9 dozer at 140 $/hr ......................................................................................... $1,120 <br />Topsoi/Application; Replace avg. 6 in topsoil on 9.7 ac. (7,825 cy) using a 637 scraper <br />and a D-9 dozer at approx. 69.7% of effort for scraper (used for hauls longer than about <br />200 ft (avg. one way of about 400 ft); and 30.3% of effort for dozer (used on side slopes <br />and push distances <200 ft. (Avg. 100 ft)). Est. Performance for scraper of 350 CY/hr <br />(cat performance handbook; includes correction factors). Approx 15.6 hr say 16 hr. at <br />250$/hr. Est performance for D-9 dozer with straight blade of 550 CY/hr (cat <br />performance handbook; includes correction factors). Approx 4.3 hr. say 5 hr. required at <br />140 $/hr. Total combined dozer and scraper cost .............................................. $4,700 <br />