Laserfiche WebLink
PART I Page 5 of 20 <br />Permit No. COR-040000 <br />A. COVERAGE UNDER TffiS PERMIT (cont.) <br />5. Individual Permit Criteria <br />Aside from the operation type, the Division may use other criteria in evaluating whether an individual permit is <br />required instead of this general permi[. This information may come from the application, SWMP, or additional <br />information az requested by the Division, and includes, but is not limited to, the following: <br />a. the quality of the receiving waters (i.e„ the presence of downstream drinking water intakes or a high quality <br />fishery, or for preservation of high quality water); <br />b. the type of mining operation, including pollution potential; <br />c. the volnmr and type of materials handled; <br />d. the size of the facility; <br />e. evidence of nonwmpliance under a previous permit for the operazion; <br />f. the use of chemicals within the stormwater system. <br />In addition, an individual permit may be required when the Division has shown or haz reason to suspect that the <br />stormwater discharge is a significan[ contributor of pollutants to waters of the State. <br />6. Permit Expiration Date <br />Authorization to discharge under this general permit shall expire on September 30, 2001. The Division must <br />evaluate and reissue this general permit once every five years and must recertify the applicant's authority to <br />discharge under the general permit at such time. Any permittee desiring continued authorization under the general <br />permit must reapply by June 30, 2001. The Division will determine if the applicant may continue to operate under <br />the terms of the general permit. An individual permit will be required for any facility not reauthorized to discharge <br />under the reissued general permit. <br />B. STORMWATER MANAGEMENT PLAN -ACTIVE MINES <br />A stormwater Management Plan (SWMP) shall be developed for the portion of each facility covered by this permit. The <br />SWMP shall be prepared in accordance with good engineering practices. (The plan aced not be completed by a <br />registered engineer.) The plan shall identify potential sotuces of pollution (including sediment) which may reasonably be <br />expected to affect the quality of stormwater dischazges associated with the mining operation. In addition, the plan shall <br />describe and ensure the implementation of best management practices (BMPs) which will be used to reduce the pollutants <br />in stormwater dischazges azsocia[ed with mining activity and to assure compliance with the terms and conditions of this <br />permit. <br />Permittees must implement the provisions of their SWMP az a condition of this permit. The Division reserves the <br />right to review the plan, and to require additional measures to prevent and control pollution az needed. <br />SWMPs which met criteria in the previous version of this permit are acceptable <br />The SWMP for active mines shall include the following items, at a minimum: <br />' I. Description of Minina Activities <br />The plan shall provide a narrative description of the mining and azsocia[ed activities taking place a[ the site which <br />affect or may affect stormwater runoff intended to be coveted by this permit. The narrative description shall report <br />the total acreage within the mine site and an estimate of the number of acres of disturbed area. A general <br />description of the location of the mining site relative to major transportation routes and communities shall also be <br />provided. <br />