Laserfiche WebLink
1 <br />A~~~tiL~~~~-~ <br />III. COMMENTS -COMPLIANCE - <br />;` -r- Below are comments on the inspection. The comments include discussion of observations made dwing the <br />:,,. inspection. Cormnents also describe any enforcement actions taken during the inspection and the facts or , ., <br />evidence supporting the enforcement action. <br />,sr~, <br />This, wa§ a complete irxspectioxi of the YoastMine conducted omNouember 133 2063 <br />Boulay of the DMG. Roy Karo~of-Seneca Coal Company (SCC) was.present during <br />inspection. Weather conditions were cloudy and cold., Ground conditions ax the'xiir. <br />wet and partial)y snow covered. Only portions of the site were accessible `due,to mti~ <br /> <br />saturated road conditions. <br />and <br />F <br />Bast ~e where , _ ~, FIs ret. <br />` f ~~ <br />45i y 3 g.; ~. ;: <br />K ~.;~ <br />~ay~ .:~ <br />3.8 a~ <br />The z <br />tk~ o <br />was Novenkber.ll <br />an, it is evident than <br />;, :, ; ;. <br />:~ <br />- :r= _ 4 <br />Ponds 010;-012, and 014 were also viewed., Ponds 010, 012, and 014 were all retaining water but . <br />notdischazgng aC the time of this inspection. Gaod progress has been made in the Constructioq ~ .;; ' ~ _ <br />of Pond 013 since the last inspection. The embankment;,inlets and dischargestrtictures'have alI <br />been completed. Work was in progress to complete the emergency spillway.., <br />Back611 & Gradine Topsoil and Reve etg ation t <br />The area designated for backfill and grading in 2001-2002 as shown on Exhibit 19-1A has not :. . <br />been completed. This area is located adjacent to the 2003 variance azea immediately south of the <br />Valora Pit. Cessation Order CO-2003-012 was issued on October 22, 2003 for failure to <br />