Laserfiche WebLink
<br /> <br />EXHIBTT E <br />simplistic range of restoration techniques would suffice. The following alternatives to intensive <br />reclamation will be applied where conditions warrant. <br />• Supplemental fertilization. The disturbed area will be broadcast fertilized where it is <br />determined that the remaining vegetation can successfully stabilize the area with a supplemental <br />fertilizer treatment. <br />• Supplemental seeding. The disturbed area will be seeded where it is determined that the <br />existing plant cover is not sufficient to hold soil in place. Minimal seedbed preparation and soil <br />covering will be acceptable. This alternative may be combined with supplemental fertilization as <br />necessary. The native seed mixture to be used is depicted in Table E-5: Adjunct Disturbance <br />Seed Mixture below. Either drill or broadcast seeding methods will be considered acceptable <br />depending upon the size of the disturbed area and concomitant revegetation activities, if any. <br />When broadcast seeding techniques are used, the seeding rate shown will be doubled. <br />Tree Buffer Plantines <br />Tree buffer plantings will be completed along the project border paralleling Taft Hill Road. The <br />buffer will be designed to achieve ayear-round, semi-opaque barrier which permits a filtered <br />view between Taft Hill Road and the mineral extraction area. The overburden stockpiles, <br />constructed and revegetated as a part of this project, will also aid in buffering/screening views of <br />the project area and in achieving the standards set forth in Section 8.5.9A; Landscape Design <br />Standards of the Larimer County Code. In addition, these plantings are seen as a means of <br />achieving the wildlife habitat development goals set for this project. <br />Buffer plantings will employ methods, materials, techniques, and success standards (Section <br />8.5.9: Landscape Design Standards) acceptable to the County. Individual tree plantings will be <br />made on 30-foot centers. A total of 50 trees will be planted. Though the planting will occur in a <br />single line, plantings will be staggered perpendicular (a maximum of 5 feet) within the line to <br />break the straight visual form. <br />A candidate Gst of species which may be planted is presented below (Table E-l: Tree Species <br />Suitable for Buffer Plantings) consisting of native, adapted species. No tree species will <br />comprise more than 25 percent of the total number of trees planted. Individual species planting <br />sites will be selected by the planting supervisor. Conifers species will be emphasized. <br />No trees or shrubs currently exist along the area proposed for planting. <br />