Laserfiche WebLink
<br />6. This plan is to submit estimate of cost to reclaim the <br />affective site less then three acres <br />PLAN GOLD BASIN,.. RECLAMATION. <br />To back fill daily as placer gravels are removed wash rock <br />and tailings from wash plant will be returned to the open <br />ended pit and graded 3:1, topsoil will be scraped over <br />affective area to be reclaimed. This will keep the pit <br />opening at approximate 600sq.ft. and the total reclamation <br />to a minimum, at the time the site has reached a point of <br />maximin recovery. <br />There will be a tailing pond that will be approximate 14,800 <br />sq. ft. approximate 5'ft deep, both pit and pond will be <br />closed up and graded out in the ]apt quarter of 1995. <br />Specific cost requested by Mined Land Reclamation. <br />Back filling 51,100.00 <br />Grading 200.00 <br />Topsoil 900.00 <br />Seeding 200.00 <br />Mulching 900.00 <br />Fertilizer 100.00 <br />Labor 200.00 <br />Total 52,600.00 + 15.8 = 53010.80 Total <br />ac. <br />Topsoil, Grading, Subsoil 51700.00 3,507 cu.yds. .4847cents <br />per cu. yd. <br />Seeding, Mulching, Fertilizer 5700.00 3 acres = S233.00 per <br />Note to M.L.R.D. the 15.8 or 5410.80 was not averaged into <br />3 acres or cu. yds. <br />