Laserfiche WebLink
<br />.- EXHIBIT D - RECLAMATION PLAN ------------------------------ <br />D. The grass seed will be broadcast and the application <br />rate would be expected to be twice the rate as for seed <br />drilling. The seed will be then raked. <br />E. If a mulch is needed we will ask Local Soil <br />Conservation what type of mulch and grass seed would be <br />best suited for that elevation and the rate of <br />application. <br />F. From my observations there seems to be no shrubs or <br />trees growing in the affected area. <br />4. When the mining project is completed the ponds will <br />be drained and leveled out, and grass seed will be planted. <br />The ponds for the mining project our planned to be shallow <br />and no high banks we see no problems !n grading to the <br />original contour of the land. <br />5. I can't <br />tailing impound <br />My project plan <br />keep grading to <br />balance no need <br />property. <br />see a reason in having waste rock dumps and <br />if proper mining management is in practice. <br />is to use the waste rock for back fill and <br />prevent erosion and to maintain hydrologic <br />to cause further damage to the surface of my <br />The sediment and tailing ponds will be aprox. 1L1~,~00 sq, ft. <br />with 5'ft, depth with a vinyl lining. The sediment trapped <br />on the vinyl at the end of the season will be scraped off <br />assayed and sold to a processor out of state, if the <br />sediment <br />assays poorly then it will become back fill and the vinyl <br />liner will be rolled up and saved for next season. <br />6. I will be committing to a 8 Warranty. <br /> <br />