Laserfiche WebLink
<br />• 12. I plan to make no open pits or bank cuts that will <br />allow soil erosion, make gentle grades and impound all water <br />from the sluice boxes. I plan to construct a earth dam at <br />the base of the affected area to catch and hold all run off <br />to prevent off sit damage. Keep the topsoil clean up and <br />graded out daily, use no chemicals or mercury on the <br />property. <br />13. The alluvial gravel will be process on-site <br />includes screen[ng and washing~no crushing leaching or <br />milling will be done, this will only be a placer mining <br />progect. <br />No plant facilities, no tailing and heaps, no chemical <br />treatment will be used. <br />Drainage control. During the mining operation in the summer <br />the upland drainage will be directed into Cashe Creek Ditch <br />as always as nature has designed the water shed. The <br />significant rainfall that falls directly on the affected <br />area will be directed into the fresh water pond to be <br />utilized by the screenplant, if the freshwater pond becomes <br />full there will be a outlet port to the settling pond. <br />When the mining season is over the settling ponds will be <br />drained and cleaned and left open till the next mining <br />season. <br />Maps and Plans: See Exhibit E Maps <br />Y <br />