My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE55601
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE55601
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:58:23 PM
Creation date
11/20/2007 4:39:45 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1992045
IBM Index Class Name
Permit File
Doc Name
LIMITED IMPACT OPERATION 110 2 RECLAMATION PERMIT APPLICATION FORM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />1. 1992 June to October at 12,000 ft. the <br />W@dCh@C Will ~1P1~1l1@ the EtdCt up time. 1993 <br />June to October <br />1994 June to October <br />1995 June to October Will be completed. <br />2. In the affected area the topsoil suitable for <br />plant growth ranges 0 to 3" from my own observations. <br />Only native grass grows. I plan to remove the topsoil and <br />reapply plant growth medium on a graded area immediately <br />after salvage. <br />3. Overburden runs 3 to 4 ft. aprox. <br />4. Thickness of the deposit 5 to 6 ft. aprox. <br />5. The road or access route is county road # 398 from <br />US. 24 at Granite. It is maintained by the county within <br />1/2 mile from my property. The last 1/2 mile is a forest <br />road that has been maintained by the local miners. <br />A open ended pit will be dug to extract placer deposits from <br />the channel, when the pit is large enough to turn a one <br />yard loader freely a one yard bucket of material will go to <br />the wash plant and a yard of wash rock aid-tai, ing sands <br />~N~ .i-1-l-comeback to~the pit. With thi lan I believe <br />(~.p,pC`r keep my reclama't-i-own plan in check. I would like to grade off' <br />°~a each f,~l l and seed:" _ _ _ ~__ _ ~_ ____. r ~ <br />~~ -_ 1. <br />Mobile office trailer 8x24' will be used for the business <br />end of the mining project. <br />A 16'x24' portable 2 section maintenance building is planned <br />for tools and processing concentrates. <br />6. As I explained in number 5 there will be a open ended <br />pit to remove placer deposits and I planed to move into the <br />channel maintaining approx. size of 20'x30' by back filling <br />as I go. <br />Y <br />I plan to back fill when the pit is large enough to do so <br />there should be very little stock piling> <br />Waste rock will be used for back filling it has to be moved <br />only one time when you back fill. <br />7. There is a good 16' road that services my 160 acre <br />property, enters at the east end of the property and passes <br />/'1011?~I <br />the affected area. I plan no new roads no improvements to <br />any old roads. <br />
The URL can be used to link to this page
Your browser does not support the video tag.