Laserfiche WebLink
RECLAMATION COST SUMMARY cont'd sheet 4 of 4 <br />K. PORTAL/SHAFT SEALING <br />Task No.~ Task Description ~ Cost (E) <br />________I__________________________________________________I____________ <br />.NA ~ No portals or shafts created by operations. <br />Subtotal (K): <br />L. DRILL HOLE/MONITORING WELL SEALING <br />Task No.~ Task Description ~ Lost (E) <br />________I______.,___________________________________________I___.,________ <br />NA ~ No drill holes or monitoring wells created. <br />Subtotal (L ): <br />M. MISCELLANEOUS RECLAMATION TASKS <br />Task No.~ Task Description ~ Cost (E) <br />_~____I_r_______________________________________________I___„________ <br />4 ~ Demolition assume 5'H•5'W'10'L mass a E0.22/tuft ~ E55 <br />2 ~ Seeding per attached task 2 worksheet ~ E860 <br />NA ~ Fencing fencing not required <br />3 ~ Mab/Demob per attached task 3 worksheet ~ E586 <br />________________________________________________________________________ <br />Subtotal (M ): E1,501 <br />TOTAL DIRECT RECLAMATION COSTS (subtotals A through M): E3,205 <br />II. INDIRECT COSTS <br />_______ ___________________ _____ <br />A. CONTRACTOR'S OVERHEAD 8 PROFIT <br />Item No.l Item Description ~ Cost (E) <br />________I______.,___________________________________________I___„________ <br />1. ~ Public Liability Insurance.... 1.550% of dir. ~ E50 <br />2. ~ Contractor's Performance Bond 1.550% of dir. ~ E50 <br />3. ~ Contractor's Profit.........., 10.OOY. of dir. ~ E320 <br />4. ~ Job Superi ntendent..equip operator acts as super <br />Subtotal (A ): E420 <br />TOTAL CONSTRUCTION CONTRACT AMOUNT (direct plus 0 8 P): E3,625 <br />~B. DMG PROJECT ADMINISTRATION EXPENSES <br />Item No.~ Item Description ~ Cost (E) <br />________I______________________________.._______________________________ <br />1. ~ Minerals Program Admin. Fee at 5.00% of cnt r.~ E781 <br />NET INDIRECT COST PERCENTAGE: 18.76% Subtotal (B ): E181 <br />__________ ____________ <br />TOTAL INDIRECT RECLAMATION COSTS (subtotals A through B): E601 <br />TOTAL PERFORMANCE BOND AMOUNT (direct plus indirect costs): E3,806 <br />