My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE55505
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE55505
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:58:19 PM
Creation date
11/20/2007 4:36:47 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1998022
IBM Index Class Name
Permit File
Doc Date
4/29/1998
Doc Name
COST OF RECLAMATION ESTIMATION FINANCIAL WARRANTY CONGER HARVESTING AREA PN M-98-022
From
DMG
To
BALAZ & ASSOCIATES
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECLAMATION COST SUMMARY cont'd sheet 4 of 4 <br />K. PORTAL/SHAFT SEALING <br />Task No.~ Task Description ~ Cost (E) <br />________I__________________________________________________I____________ <br />.NA ~ No portals or shafts created by operations. <br />Subtotal (K): <br />L. DRILL HOLE/MONITORING WELL SEALING <br />Task No.~ Task Description ~ Lost (E) <br />________I______.,___________________________________________I___.,________ <br />NA ~ No drill holes or monitoring wells created. <br />Subtotal (L ): <br />M. MISCELLANEOUS RECLAMATION TASKS <br />Task No.~ Task Description ~ Cost (E) <br />_~____I_r_______________________________________________I___„________ <br />4 ~ Demolition assume 5'H•5'W'10'L mass a E0.22/tuft ~ E55 <br />2 ~ Seeding per attached task 2 worksheet ~ E860 <br />NA ~ Fencing fencing not required <br />3 ~ Mab/Demob per attached task 3 worksheet ~ E586 <br />________________________________________________________________________ <br />Subtotal (M ): E1,501 <br />TOTAL DIRECT RECLAMATION COSTS (subtotals A through M): E3,205 <br />II. INDIRECT COSTS <br />_______ ___________________ _____ <br />A. CONTRACTOR'S OVERHEAD 8 PROFIT <br />Item No.l Item Description ~ Cost (E) <br />________I______.,___________________________________________I___„________ <br />1. ~ Public Liability Insurance.... 1.550% of dir. ~ E50 <br />2. ~ Contractor's Performance Bond 1.550% of dir. ~ E50 <br />3. ~ Contractor's Profit.........., 10.OOY. of dir. ~ E320 <br />4. ~ Job Superi ntendent..equip operator acts as super <br />Subtotal (A ): E420 <br />TOTAL CONSTRUCTION CONTRACT AMOUNT (direct plus 0 8 P): E3,625 <br />~B. DMG PROJECT ADMINISTRATION EXPENSES <br />Item No.~ Item Description ~ Cost (E) <br />________I______________________________.._______________________________ <br />1. ~ Minerals Program Admin. Fee at 5.00% of cnt r.~ E781 <br />NET INDIRECT COST PERCENTAGE: 18.76% Subtotal (B ): E181 <br />__________ ____________ <br />TOTAL INDIRECT RECLAMATION COSTS (subtotals A through B): E601 <br />TOTAL PERFORMANCE BOND AMOUNT (direct plus indirect costs): E3,806 <br />
The URL can be used to link to this page
Your browser does not support the video tag.