Laserfiche WebLink
RECLAMATION COST SUMMARY cont'd sheet 3 of 4 <br />N. EARTHWORK - STREAM CHANNEL RECONSTRUCTION <br />Task No.~ Task Description ~ Cost (S) <br />NA ~ Stream channel reconstruction not required. <br />Subtotal (H ): <br />____________ <br />1. EARTHWORK - DRAINAGE CONTROL SYSTEM INSTALLATION/REMOVAL <br />Task No.~ Task Description ~ Cost (S) <br />________I______________________________.,___________________I____________ <br />NA ~ Drainage controls not removed, <br />Subtotal (I ): <br />J. EARTHWORK - TOPSOIL/SUBSOIL REPLACEMENT <br />Task No.l Task Description ~ Cost (8) <br />________I__________________________________________________I__________ <br />NA ~ Topsoil, if available, replaced under task 1.. <br />Subtotal (J): <br />