My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE55505
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE55505
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:58:19 PM
Creation date
11/20/2007 4:36:47 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1998022
IBM Index Class Name
Permit File
Doc Date
4/29/1998
Doc Name
COST OF RECLAMATION ESTIMATION FINANCIAL WARRANTY CONGER HARVESTING AREA PN M-98-022
From
DMG
To
BALAZ & ASSOCIATES
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />COLORADO DIVISION OF MINERALS AND GEOLOGY <br />DOZER COST 8 PERFORMANCE DATA WORKSHEET <br />Machine Make 8 Model: Cat DSC SERIES I11 <br />Dozer Blade: POWER ANGLE TILT <br />Attachment #1: ROPS tab <br />Attachment #2: 3-shank ripper <br />Last Cost Revision: April, 1997 <br />BASE EOUIPMENi COSTS (CRG) <br />sheet 1 of 2 sheets <br />REFERENCES: 1) Cost Reference Guide (CRG) <br />2) Contractors Equi Anent Cost Guide (CECG) <br />3) Colorado Contractors Association <br />Wage Rate Schedule <br />4) Caterpillar Performance Handbook <br />~ ----------- Base Ownership 8 Overhaul Costs ------------~ --------------- Base Operating Costs ---- --- •--- ---- <br /> Ownership ~ Overhaul Field Repair <br /> Depreciation CFC Overhead I Lahar Pares~ Labor PAres ~ Fuel Lube Tires G~. E .C. <br />Machine 54.73 51.87 51. 65 52.64 52.92 53.21 52.12 54. 09 50.98 50. 00 50. 35 <br />Attachment #1 50.00 50.00 50. 00 50.00 50.00 50.00 50.00 50. 00 50.00 50. 00 50. 00 <br />Attachment #2 50.80 50.21 50. 20 50.31 50.34 50.51 ~ 50.36 50. 00 50.07 50. 00 50. 30 <br />COST ADJUSTMENT FACTORS (CECG) <br />Factor Description Base Value Adj. Yalue Mul [ipLier <br />Acquisition cost: 590,773.00 561,387.24 0.676 <br />Scan. life hrs.-machine: 10,655 9,370 1.137 <br />-attach. #1: 11,000 11,000 1.000 <br />-attach. #2: 8,200 8,200 1.000 <br />Annual use hours: 2,112 1,380 1.530 <br />Mechanic's labor cost: 527.15 523.49 0.865 <br />Fuel cost/gal.-gasoline: 51.20 51.20 1.000 <br />-diesel: 51.07 51.07 1.000 <br />Cube cost: 50.98 50.98 1.000 <br />Tire life hours: 0 0 1.000 <br />Tire factor: 0 0 1.000 <br />Tire cost: 50.00 50.00 1.000 <br />ACQUISITION COST BREAKDOWN <br />Cast Elements (CECG) Factor Adj. Cast <br />Base purchase price 590,773.00 <br />Less dealer discount 0.142 512,889.77 <br />Plus freight 0.013 51,180.05 <br />Plus dealer charges• 0.005 5453.87 <br />•CDMG estimate ------------ <br />Adjusted purchase price 579,517.15 <br />Plus taxes: Sales a 3% 52,385.51 <br />SMM 02Y. ~ 51,590.34 <br />Less tire cost 50.00 <br />Less salvage value 0.278 522,105.77 <br />Net acquisition cast 561,387.24 <br />ADJUSTED EQUIPMENT COSTS <br /> ---------- Adjusted Ownership 6 Overhaul Costs --••---••~ ------------- Adjusted Operating Costs --•-- -----•'- <br />___________________ <br />Acquisition cost ____ _ _ <br />53.74 <br />N/A <br />N/A ________ <br />N/A _______ <br />N/A <br />N/A ____ <br />N/A ______ <br />N/A ______________ <br />N/A _______ <br />N/A ________ <br />N/A <br />Econ.life -Dozer 8 ROPS 54.25 N/A N/A 53.00 53.32 53.65 52.41 N/A N/A N/A N/A <br />-Attach. #2 N/A N/A N/A 50.35 50.39 50.58 50.41 N/A N/A N/A N/A <br />Annual usage 55.72 53.18 52.83 N/A N/A N/A N/A N/A N/A N/A N/A <br />Double shifts 54.29 51.59 51.42 N/A N/A N/A N/A N/A N/A N/A N/A <br />Triple shif [s 53.82 51.06 50.94 N/A N/A N/A N/A N/A N/A N/A N/A <br />Hech.labo r-Dozer 8 ROPS N/A N/A N/A .52.60 N/A 53.16 N/A N/A N/A N/A N/A <br />-Attach. #2 N/A N/A N/A 50.31 N/A 50.50 H/A ~ N/A N/A N/A N/A <br />Fuel/tube -Dozer 8 ROPS N/A N/A N/A N/A N/A N/A N/A 54.09 50.98 50.00 50.35 <br />-Attach. #2 N/A N/A N/A N/A N/A N/A H/A 50.00 50.07 50.00 50.30 <br />
The URL can be used to link to this page
Your browser does not support the video tag.