My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO24272
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO24272
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:44:24 PM
Creation date
11/20/2007 4:31:42 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Hydrology
Doc Date
9/13/2006
Doc Name
Well Application Receipt #3607538 Request for Variance
From
CC&V
To
COE
Permit Index Doc Type
Correspondence
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />t.iep:vanent ur :~_~ ru. a. Res~~urc~s <br />}73 :herror'.n ~irget. Ror>m 818 <br />Deriver, Colorado 80203 <br />Phone (303) 866-3581 <br />FAX (303) 866-3589 <br />www.wa[ecstate.co.us <br />August 25, 2006 <br />TIMM COMER <br />CRIPPLE-CREEK & VICTOR GOLD MINING COMPANY <br />PO BOX 191 <br />VICTOR CO 80860 <br />r ;e <br />. .Bill Owens ~ ~ ~' <br />Ruuell George <br />Executive Director <br />~- Ha1 D. Simpsan.P.E. <br />State Engineer <br />RE: .Well. Permit Application Receipt No. 360753$, Arequa Gulch Pumpback <br />System <br />Dear Mr. Comer: <br />The referenced well permit application is being returned for the reasons stated below. <br />When resubmitting the application, please_retum it to the above address for completion of the <br />evaluation. <br />Because construction of the Arequa Gulch Pumpback System does not meet the minimum <br />well construction standards as outlined in the Water Well Construction Rules (2 CCR 402-2), it will <br />be necessary for you to submit a written request for a variance to the State Board of Examiners of <br />Water Welt Construction and Pump Installation Contractors ("Board"). Variances are covered <br />under Rule 18: The Water Well Construction Rules can be viewed online at the following site: <br />http://www.water.state.co.us/boe/rulesregs/constructionrules05.pdf . In general, the variance <br />request should specify the following: <br />a. the nature and reason for seeking the variance; <br />b. the proposed construction details (diagram of proposed structure), and <br />c. special precautions that will be taken to protect the well from contamination. <br />The variance request can be included with the permit application when returning it to this <br />office. The Board will respond in writing to the variance request. <br />If you have any questions, please contact me. <br />JWB/cripple creek/au/letters <br />Enclosure <br />Sincerely, <br />John W..Bilis ` <br />Phy. Sci: Researcher/Scientist ' ~ ;` _ ', ~ ; <br />Water Supply Branch SoufFi Region- ; . <br />
The URL can be used to link to this page
Your browser does not support the video tag.