Laserfiche WebLink
• EXHIBIT E — RECLAMATION PLAN P9.ge 2 <br /> There should be no impact on the water resource qualitr due to the <br /> closed system operation with no discharge from the are . <br /> The reclamation time schedule is presented in a table ind on the <br /> Reclamation Plan Map F-1 in Exhibit E. The schedule 13 based on <br /> the maximum extraction rate presented in the Mining P13.n and may <br /> vary due to customer demand for product. The sequence of the <br /> schedule, however, will be followed. <br /> Fountain Sand and Gravel Company believes the above P1 n meets all <br /> applicable requirements of Rule 6 . <br />