My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE55100
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE55100
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:58:02 PM
Creation date
11/20/2007 4:27:16 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083A
IBM Index Class Name
Permit File
Doc Date
9/25/2003
Doc Name
pages 2.05-59 through 2.05-116
Section_Exhibit Name
Rule 2.05 Operation and Reclamation Part 2
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I• <br />2.05.6(6) <br />A subsidence handbook is presented in Volume III, Exhibit 15. This <br />handbook addresses the necessity for repair and restoration as well as repair <br />and restoration procedures for surface streams, ponds, springs, <br />groundwater, landslides and roads and trails. <br />Additionally, any surface improvements (existing or permitted) which are <br />damaged or destroyed by subsidence will be restored, rehabilitated or <br />replaced by the Operator. With respect to the Bruce Park Reservoir and <br />dam, should structural damage result from mining-related activities, the <br />Operator will repair the damage and will also be responsible for damage to <br />injured parties. If deemed necessary by the DMG and the surface <br />management agency to provide for continuance of existing land uses, land- <br />surface contours affected by subsidence will be restored to premining <br />conditions. <br />• <br />(f)(v) A narrative of the detailed description of measures to betaken to determine <br />the degree of material damage or diminution of value or foreseeable use of <br />the surface follows: <br />(f)(v)(A) <br />The features which might be materially damaged by subsidence include the <br />water resources, roads and trails and landslides within the permit and <br />adjacent area. The creeks, springs and ponds within the area projected to <br />be mined in current mine plan (ref. Map 14) have been extensively <br />monitored. The water level and water quality of the groundwater within the <br />formation has also been monitored. The results of the monitoring are <br />presented in Volume III, Exhibit 3. Map 6, Geologic Hazards, shows the <br />present location of existing landslides, debris flow, potentially unstable <br />slopes and rock fall hazards. <br />No pre-subsidence survey is proposed for the power line support towers in <br />Terror creek because no mining is projected under this structure. A pre- <br />subsidence survey will be done for Terror Creek Reservoir and dam prior to <br />any mining within one mile of the structure. <br /> <br />PR-08 <br />,~ PPR6vED <br />'/"Z-5 /0 3 <br />2.05 - 111 - 07/03 <br />
The URL can be used to link to this page
Your browser does not support the video tag.