My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE55072
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE55072
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:58:00 PM
Creation date
11/20/2007 4:26:07 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980006
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
PART 822 OPERATIONS IN ALLUVIAL VALLEY FLOORS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Section 822. 14 (d) Continued. <br />1) Township 9N, Range 79W, Section 29, SE corner of SE corner. <br />2) Township 8N, Range 77W, Section 5, NW corner of NW corner, <br /> and Section 6, NE corner of NE corner. <br />3) Township 9N, Range 78W, Section 13, SE corner of NW corner. <br />4) Township 9N, Range 78W, Section 10, SE corner of NE corner, <br /> and Section 11, SW corner of NW corner. <br />5) Township 9N, Range 78W, Section 36, SE corner of NE corner. <br />These locations are: l) adjacent to the Kerr Tipple Area; and 2) <br />upstream of the Mine Plan Area on the Canadian River, 3) adjacent <br />to the Mine Plan Area on the Canadian River, 4) downstream from the <br />Mine Plan Area on the Canadian River, and 5) downstream from the <br />Mine Plan Area on Bolton Draw. <br />The monitoring sites will consist of one shallow well drilled and <br />• cased through the alluvium for ground water level measurement and <br />sampling; a stream sampling facility on the main stream course; and <br />staff gages for measurement of stream stage. Pre-installation data <br />collection will include a vegetative inventory including species <br />and population counts, a pump test to determine the permeability of <br />the alluvium, and soil moisture measurements with a neutron probe <br />access tube. The monitoring facilities will be fenced off to <br />prevent damage by cattle or machinery. <br />The schedule of monitoring will be as prescribed in Table 61, Kerr <br />Mine Area Hydrologic Monitoring Schedule. The facilities will be <br />monitored monthly during high flow in the spring and quarterly at <br />other times for the length of the mining and reclamation period. <br />Hydrologic data from the monitor sites will be correlated to stream- <br />flow and water quality monitoring performed at the USGS gaging <br />stations upstream and downstream from the mine plan area. <br />• Agricultural production data will be obtained with the cooperation <br />of farms and ranches operating on the alluvial valley floors. <br />822-7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.