My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE54944
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE54944
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:57:54 PM
Creation date
11/20/2007 4:22:57 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1994082
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Doc Name
FPC SHEETS
Section_Exhibit Name
TAB 25 ATTACHMENT 25-2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CATERPILLAR INC. <br />• FLEET PRODUCTION AND COST ANALYSIS <br />Yoast Reclamation Bond SCC 20-FEB-1 Page - 9- <br />RETURN - Travel Time b Speeds <br />Yoast Reclamation Hond <br /> 1 Course I Course I Material 1Density Lbs per) Initial) I HAVLER 637E I <br /> 1 Name I Desc I Qty TONS I LCY I BCY I Speed I I ID YOAST I <br /> ________ ____________ __ __________ _______ _______ __MPH-- I Tires 37.25 -35 1 <br /> 1B ISHOP AREA I 26,4051 2,075 1 2,518 I 0.00 I I Type E3 1 <br /> -------- ----------- -- ---------- ----'- -°---- ------- I Speed Corr. 1.001 <br /> Empty Wt., TONS 56.04 Payload, TONS 32.25 Code C134 I Alt. Corr.. 0.891 <br /> I RETURN Distance Rolling Grade MPH Potential Segment Speed Cumul ative) <br /> (Segment FEET Resists & Limit Speed Max at End Minu tes 1 <br /> I 1. 1,400 5.00 <br />------------------------ 7.10 30.00 13 <br />------------------- .16 13.14 <br />----------------- 0.00 <br />------- <br />------ 1.30 I <br />----- <br /> Cost Summary --_ TS RE PL - C <br /> <br />-- <br />- Yoast Reclama <br />- <br />--- <br />-- <br />- tion Hond <br />-- <br />- 27,827 <br />- <br />- <br />- TONS <br />-- <br /> ---------------- <br />---- <br />- <br />I --- <br />-- <br />-- <br />--- <br />(Cost per Hour1 -- ----- <br />--- <br />--- <br />Operating I ---- <br />- -- <br />- - <br />I $ - <br />-- <br />per I <br /> 1 Equipment Qty Model <br />________________________ I (each unit) I <br />____ _____________ Hours I $ <br />___________ _____ Total <br />_______ I TON I <br />_ _________ <br />• -- <br />-- <br />-- <br />I Loaders <br />- <br />- -- -I ---- I <br />-- <br />---- -__ __--0__I_ ___ _-----0 I 0 <br />- - .000 I <br />-- <br /> --- <br />-- <br />-- <br />-- <br />---- <br />- <br />1 Haulers 4-637E - <br />I 199.46 I 65 I 13,025 I 0 .468 I <br /> I I I 0 1 D 1 0. <br />- 000 1 <br />-- <br /> I <br />I Total 4 1 I <br />I I <br />- ------- I---- <br />65 I <br />-- <br />-- <br />- '------ <br />13,025 <br />- <br />- I <br />-- <br />I 0. <br />--- 1 <br />-- <br />468 1 <br />--- <br /> ------------------------ <br />I Support A l 1-14G ---- -------- <br />---- <br />I 64.68 I --- <br />--- <br />- - <br />--- <br />5 I - <br />- <br />---- <br />318 - <br />- <br />I 0. - <br />011 1 <br /> I 2 1-W.WAG I 182.92 I 5 I 899 I 0. 032 I <br /> I 3 I I 0 I 0 1 0. 000 I <br /> I 4 I I 0 I 0 1 0. 000 1 <br /> I 5 I I 0 I 0 1 0. 000 I <br /> I 6 I I 0 I <br />-- <br />--- 0 <br />------ 1 O. <br />---- OOD 1 <br />--- <br /> I <br />1 Total 2 I I <br />I I <br />- <br />-- --- I <br />- <br />-- <br />10 I <br />- <br />-- <br />-- <br />---- - <br />1,217 <br />------- I <br />1 0. <br />----- I <br />044 I <br />---- <br /> ------------------------- <br />1 Fleet Total 0 <br />------------------------- -------- <br />--- <br />-- <br />I I <br />--- ------------- --- <br />--- <br />- <br />75 I <br />----------- ----- - <br />14,242 <br />-------- I 0. <br />----- 512 I <br />---- <br />• <br />25-2-6 Revised 02/01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.