My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE54944
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE54944
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:57:54 PM
Creation date
11/20/2007 4:22:57 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1994082
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Doc Name
FPC SHEETS
Section_Exhibit Name
TAB 25 ATTACHMENT 25-2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CATERPILLAR INC. <br />• FLEET PRODUCTION AND COST ANALYSIS <br />Yoast Reclamation Bond SCC 20-FEH-1 Page - B- <br />----------------------------------------------------------------------------- <br /> Productivity and Cost --_ TS RE PL -B FPC-lc2 <br /> -----------------Loader-------Haulerl----Hauler2- ---Potential Production--- <br /> I Qty 6 Model 4-637E I I TONS /Hour Avg MPHI <br /> I BCY /Load ( 2,518 Lbs/BCY). 25.62 I I I <br /> I Hauler - Payload, TONS....... 32.25 I 1637E 2,147 8.8 I <br /> I - $ of Max GVW ....... 94.4 I I I <br /> I Load Time, Minutes .......... 1.00 I -------------------------- <br /> I I ----Operating Schedule---- <br /> ( I I Operator Efficiency 90$1 <br /> I <br />I I I Sched Hrs/Year 2,000 I <br />I -------------------------- <br /> ----------------Hauler Cycle Time---------------- -----Fleet Estimates------ <br /> I Load ........................ 1.00 I I Fleet Availability 83.0$1 <br /> I Haul ......................... 0.70 I I TONS /Sched Hr 1,603 I <br /> I Dump and Maneuver............ 0.60 I I Total TONS 26,405 I <br /> I Return ....................... 1.30 I I Sched Hrs Reqd 16 I <br /> I Potential Cycle Time.. 3.61 I I Total $ 11,924 I <br /> I Wait on Slow Hauler.......... I I $ per TON 0.452 I <br /> I Wait to Load. [Bunching-AVG ). 0.00 I I TONS /Year 3,206,920 I <br /> I Total Cycle Time...... 3.61 I I Years Required 0.00 I <br /> <br />• ------------------------------------------------- -------------------------- <br />HAUL - Travel Time S Speeds <br /> Yoast Reclamation Bond <br /> I Course I Course I Material IDensi ty Lbs perl Initiall I HAULER 637E I <br /> I Name I Desc I Qty TONS I LCY I BCY I Speed I I ID YOAST I <br /> -------- ------------ ------------ ------- ------- --MPH-- I Tires 37.25-35 I <br /> IB ISHOP AREA I 26,4051 2,075 12,518 I 0.00 I I ape E3 I <br /> -------- ------------ ------------ ------- ------- ------- I Speed Corr. 1.001 <br /> Empty Wt., TONS 56.04 Payload, TONS 32.25 <br />------------------------------------------------- Code C134 I Alt. Corr.. 0.891 <br />--------- ---------------- <br /> I HAUL Distance Rolling Grade MPH Potential Segment Speed Cumulative) <br /> (Segment FEET Resist$ $ Limit Speed Max at End Minutes I <br /> I 1. 1,400 5.00 -7.10 30.00 34.46 <br />-------------------------------------------------- 30.00 0.00 0.70 I <br />---------------------------- <br />u <br />25-2-5 Revised 02/01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.